说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 句库 -> 双线简支箱梁
1.
Scheme comparisons and selections of simple box girder fabricating yard of the passenger dedicated lines
客运专线双线简支箱梁梁场建设方案比选
2.
Techno-economic analysis of double track simple girders on passenger dedicated lines;
客运专线双线简支箱梁技术与经济分析
3.
Prestressing Construction Technology of 32-m Double-Line Simply-Supported Box Beam in Passenger Dedicated Line
客运专线32m双线简支箱梁预应力施工技术
4.
Loading design on the grade 2.0 static load experiment of 32 m double lines simple box beam
32m双线简支箱梁2.0级静载试验加载设计
5.
Control factors,engineering measures and computation of time limit of full span double-tracked simple box girder transport;
整孔双线简支箱梁运输控制因素及工程措施和工期计算
6.
Precasting and Installation of the Double-Track Simply Supported Monolithic Box Beams of High-Speed Railroad;
高速铁路双线整孔简支箱梁的预制和安装
7.
Static Load Test Technology of 32 m Double Lines Post-tensioned Precasted Concrete Simple-supported Box Beam for Passenger Dedicated Line
客专32m双线后张法PC简支箱梁静载试验技术
8.
On economical comparison of beam fabricating yard of simple box girder along passenger dedicated line
客运专线简支箱梁梁场规划的经济比选
9.
Research on Construction Technology of Integrated Span Simple Support Girder for Qinhuangdao-Shenyang Passenger Dedicated Railway;
秦沈客运专线整孔简支箱梁施工技术研究
10.
The Self-Vibration Analysis on Qinshen Railway Box Girder Bridges;
秦沈客运专线整体简支箱梁自振特性分析
11.
Study on Mechanics Effect of Simplesupport Box Girder Used in High-Speed Passenger Railway;
高速铁路客运专线简支箱梁力学效应研究
12.
On the Quality Control over the Prefabricate Simple Box Girder Reinforcing Bar Engineering on Railway Line for Passenger Traffic
客运专线预制简支箱梁钢筋工程质量控制
13.
Test Study of C50 Antifreezing Concrete Used for Simply-Supported Box Girders on Passenger Dedicated Railway
客运专线箱形简支梁C50抗冻混凝土试验研究
14.
Construction Method of Post-pouring Flange Plate of Simple Box Girder in Passenger Dedicated Line
客运专线简支箱梁后浇翼缘板施工工法
15.
Prefabricating Techniques for Simply Supported Box Beams for Passenger Transportation Railway
铁路客运专线混凝土简支箱梁预制施工技术
16.
On construction technique of moving support cast-in-place 900 t simple box girder
移动支架现浇900t简支箱梁施工技术
17.
Techno-economic comparison and construction organization design of simple box girders on passenger dedicated lines;
客运专线简支箱梁施工技术经济比选及施工组织设计
18.
The Construction Technology Analysis of Boxing Beam and Girder with 900 Tons and Simply Supported in Railway Passenger Dedicated Line With 350km Per Hour
时速350km铁路客运专线900t简支箱梁制架施工技术分析