说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 句库 -> 新建隧道
1.
Study on Longitudinal Deformation of Existing Metro Tunnel Caused by Undercrossing Construction and Engineering Measures;
新建隧道下穿施工对既有隧道纵向变形的影响和工程措施研究
2.
Numerical Simulation Analysis for Influence of New Tunnel on Existing Tunnel and Surroundings;
新建隧道对既有隧道及周围环境影响的数值模拟分析
3.
Research on the Newly-built Tunnel Roof Settlement Prediction Based on Verhulst Model
基于Verhulst模型的新建隧道顶板下沉预测研究
4.
The Application of Multi-Objective Planning Theory to Optimize Excavation Sequence in the New Tunnel
多目标规划理论在新建隧道开挖顺序优化问题中的应用
5.
An Improvement on the Construction Process of Double-tracked–Single Bore Long Tunnel
新建铁路长大隧道“单洞双线轨道运输”工序改良
6.
Industrialisation in tunnel construction, tunnel upgrading and widening
隧道建设工业化,隧道的改善和加宽.
7.
Construction technology of Wuhan Changjiang tunnel―the first tunnel under Changjiang River
长江第一隧——武汉长江隧道修建技术
8.
He suggested that a double railway-tunnel should be built.
他提议建一条双轨隧道,
9.
New Cascade Railway Tunnel
新喀斯喀特铁路隧道
10.
Despite the new tunnel, there are still a few people who rashly attempt to cross the pass on foot. .
尽管新建了隧道,有些旅行者还是企图步行穿过山口。.
11.
Results of Rock Stress Measurements and Engineering Significance of Song-shu-yuan Tunnel in New Railway from Dali to Li-jiang in Yun-nan Province;
云南大理—丽江新建铁路线松树圆隧道地应力测试及其工程意义
12.
Design of a shield tunnel underground crossing newly-built sea dike and analysis of settlement observation
盾构隧道穿越新建海堤时的设计与沉降观测分析
13.
Application of ADECO-RS Approach in Design and Construction of Tunnels: Case Study on Tartaiguille Tunnel on TGV Mediterranean Line(From Lyon to Marseilles)
新意法在法国里昂—马赛高速铁路Tartaiguille隧道建设中的应用
14.
The design and construction suggestions of bidirectional six lanes double-arch tunnel
双向六车道连拱隧道设计与施工建议
15.
A new pedestrian subway has been built at the eastern side of the station concourse, linking the station to Tsuen Nam Road and the new Public Transport Interchange.
大围站的大堂东面将兴建一条行人隧道,连接村南道及新的公共交通交汇处。
16.
Name used by the tunnel initiator during the authentication phase of tunnel establishment
在隧道建立的身份验证阶段,隧道初始化程序使用的名称
17.
The Research on the Construction Plan of the Shield Tunnel Crossing from the Top of the Mining Tunnel in Small-angle and Close Range;
盾构隧道近距离小角度上穿已建暗挖隧道的施工方案研究
18.
Establishment of Construction Quality Assurance System Framework for Tunnel Projects;
隧道项目施工质量保证体系框架构建——以龙洞子隧道项目为例