说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 句库 -> 分洪枢纽
1.
Bridge Test and Evaluation of Flood Diversion Hub in Beijing Yongding River
北京市永定河分洪枢纽工程桥梁检测与评估
2.
Research on flood control investment allocation, money rising and return of investment of Shuibuya Water Conservancy Project;
水布垭水利枢纽防洪投资分摊及筹措和回报研究
3.
Restoration of damaged base-slab of spillway chute of Siping Hydroproject
寺坪水电枢纽溢洪道泄槽底板的修复
4.
Necessity of Guilin City flood control & Lijiang river water supplement project
桂林市防洪及漓江补水枢纽工程建设的必要性
5.
Design Flood Study about Xinjiang Xiabandi Hydroproject
新疆下坂地水库枢纽工程设计洪水研究
6.
Experimental Study on Hydraulic Model of Spillway Optimization in Dalong Key Water Control Project
大隆水利枢纽溢洪道优化水工模型试验研究
7.
Working out the pattern of reservoir operation and calculating the benefit of flood control for Tingzikou hydroproject Huang jia-wen Luo bin;
亭子口水利枢纽防洪调度方式拟定及防洪效益计算
8.
Research on Design of Transfer Space of Urban Public Transport Hub--With Beijing Xizhimen Traffic Hub as an Example
城市公共交通枢纽换乘空间问题分析——以北京西直门交通枢纽为例
9.
Guxian key hydraulic project will play important roles in flood prevention, sedimentation reduction, irrigation, water supply, power generation and so on.
古贤水利枢纽具有防洪、减淤、灌溉、供水、发电等重要作用。
10.
Foundation Treatment of Vibro-Replacement Stone Piles of Spillway Gates in Xixiayuan Water Conservancy Project;
西霞院水利枢纽工程泄洪闸振冲碎石桩基础处理
11.
Application of Xin'an River Three-source model to flood forecasting in Shanxi Hydraulic Complex
新安江三水源模型在珊溪水利枢纽洪水预报中的应用
12.
Analysis of the Operating Behavior of Concrete Dam of the Danjiangkou Hydro-junction
丹江口水利枢纽砼大坝工作性态分析
13.
Analysis on Transfer Organization Pattern of Urban Comprehensive Passenger Transport Hub;
城市综合客运枢纽换乘组织模式分析
14.
Study on Wuhan Constructing a Logistics Center and Pivot City with SWOT Analysis Method;
武汉建设物流中心枢纽城市的SWOT分析
15.
Analysis of Related Factors in Coordinated Management of Public Transit Transfer Hub;
公交换乘枢纽协调管理相关因素分析
16.
Study on Cost Allocation Methods for Multiobjective Water Projects;
综合利用水利枢纽投资分摊方法研究
17.
Research on length of speed change lane in exchange lane of traffic interjunction
枢纽互通立交变速车道长度取值分析
18.
Demand analysis and forecast on the freight transportation of Three Gorges Project
三峡枢纽过坝运输需求分析及其预测