1.
The Application of IT in Calculation and Management of Construction Engineering Cost;
![点击朗读](/dictall/images/read.gif)
信息技术在建筑工程造价计算与管理中的应用
2.
Road Earthwork Distribution and Cost Computation
![点击朗读](/dictall/images/read.gif)
公路工程土石方调配及造价计算的探讨
3.
Investigation on the Price Estimation Method on Non-standard Equipment and Metal Structures;
非标设备及金属结构件制作工程造价计算方法探讨
4.
Application of computer software in engineering cost management
![点击朗读](/dictall/images/read.gif)
计算机软件在工程造价管理中的应用
5.
Costs analysis of completion settlement of bidding project under bill of quantities
![点击朗读](/dictall/images/read.gif)
工程量清单计价下招标工程竣工结算造价分析
6.
Probability estimation of total construction cost for hydropower project with fuzzy estimation of subconstruction cost
子费用模糊估算的水电工程总造价概率估计
7.
On calculation method of auxiliary expenses in underground construction cost;
![点击朗读](/dictall/images/read.gif)
浅析井巷工程造价中辅助费用的计算方法
8.
Fuzzy Neural Network s Calculating Method of Building Price;
![点击朗读](/dictall/images/read.gif)
建筑工程造价的模糊神经网络计算方法
9.
A Study on Estimating Approach Based on Analysis Model for Design Parameters of Buildings
![点击朗读](/dictall/images/read.gif)
基于建筑设计参数分析模型的工程造价估算
10.
The Study of Controlling Engineering Cost Through the Construction Drawing Budget and Engineering Volume List Valuation;
采用施工图预算和工程量清单计价控制工程造价的研究
11.
Engineering Cost Control Based on BOQ Pricing Mode in Project Settlement
![点击朗读](/dictall/images/read.gif)
基于工程量清单计价模式下工程结算阶段造价控制
12.
Research and Application of Evolutionary Technique in Mobile Phone Configuration Design and Evaluation;
进化计算技术在手机造型设计及评价中的应用研究
13.
computer aided design and computer-aided manufacturing
![点击朗读](/dictall/images/read.gif)
计算机辅助设计和制造
14.
Computer-Assisted Design/Computer-Assisted Manufacturing
![点击朗读](/dictall/images/read.gif)
计算机辅助设计/计算机辅助制造
15.
Business schools train employees who are sophisticated bean counters. Heaven forbid a bean counter takes over a business.
商学院更擅长的是制造精确而廉价的'计算器',他们不可能干成大事。
16.
If there were no charge for products or services, the tendency would be to use them inefficiently.
如果对产品或服务不计算价格,则会造成资源利用的低效。
17.
Attach much weight to the source of cost control──estimate in design period
![点击朗读](/dictall/images/read.gif)
要十分重视工程造价控制的源头──设计阶段的概算
18.
The paper introduces computer application in engineering cost management and the prospect.
介绍了计算机在工程造价管理中应用的现状及前景。