说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 句库 -> 综合风险度
1.
Optimization Model of Incremental Asset Portfolio based on Integrated Risk Weight Control of Total Loan Portfolio
基于全部贷款综合风险度控制的新增资产组合优化模型
2.
The Measurement Research on Risk of Security Investment Based on Bayes Bilateral Integrated Moment;
证券投资Bayes双侧综合矩风险度量研究
3.
The Fuzzy Synthetic Evaluation of the Risks of Commercial Banks
商业银行金融风险程度的模糊综合评价
4.
An Anatomy and Comprehensive Comparison Analysis of Current CreditRisk Measurement Models;
现代信用风险度量模型剖析与综合比较分析
5.
Study on the Integrated Measurement and Control of the Interest Rate Risk of Commercial Banks
论商业银行利率风险的综合度量与管理
6.
Risk Degree Assessment of Natural Disaster Based on Set Pair Analysis Method
基于集对分析的自然灾害风险度综合评价研究
7.
Comprehensive Evaluation of Risks in Venture Investment Project Decision-making;
风险投资项目决策中的风险综合评价
8.
The Study of the Comprehensive Valuation of Investment Risks of Venture Investment Projects;
风险投资项目投资风险综合评价研究
9.
Research on A Comprehensive Method for Evaluating Risks of Venture Capital Projects
风险投资项目风险综合评价方法研究
10.
Deposit Insurance Institution:Moral Hazard and Pricing Strategy;
存款保险制度:道德风险及定价策略——国外文献综合述评
11.
Fuzzy Comprehensive Optimization of Hydropower Project Schedule with Consideration of Investment and Risk;
耦合投资-风险目标的水电工程进度模糊综合优化
12.
Evaluation of Multi-Risk Combination of Supply Chains and Its Risk Management;
供应链多风险组合的综合评估及风险管理
13.
The study about risk degree of human capital investment of High-tech enterprise based on fuzzy comprehensive evaluation
基于模糊综合评价的高新技术企业人力资本投资风险度研究
14.
Calulation of Crdit Risk by Credit Risk+ Model
聚合风险模型下的质押贷款风险度量
15.
Risk Assessment of ERP Project Based on Fuzzy Comprehensive Evaluation;
基于模糊风险综合评价法的ERP项目风险评价
16.
Approach to Comprehensive Fuzzy Estimation of Dynamic Risk for Capital Venture Process;
风险投资过程的动态风险模糊综合估测方法
17.
Optimal Mean-Variance Portfolio of Adventure-Efficient Model;
风险和效益综合模型的最优投资组合
18.
Literature of Credit Risk Measurement Theory of Commercial Banks;
商业银行信用风险度量理论研究综述