说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 句库 -> 填海造陆工程
1.
Foundation of Sea Reclamation Project in Beibu Gulf of Guananxi and the Construction Method
广西北部湾填海造陆工程地基基础及施工方法
2.
Study on the Method of Backfill in Coastal Reclamation Project of Tianjin Lingang Industrial Area;
天津临港产业区围海造陆工程吹填法研究
3.
Construction Practice of Jet-grouting Pile Water-proof Curtain in Sea Reclamation Region
填海造陆区旋喷桩止水帷幕施工实践
4.
Monitoring and Test Technique in East Sea Area Ground Treatment of Xiamen
厦门环东海域填海造地工程监测与检测技术
5.
prefabricated band drain [reclamation works]
预制的排水带〔填海工程〕
6.
Central and Wan Chai Reclamation
中环及湾仔填海工程
7.
Research on the Utilization of Marine Spatial Resource of Macao--The Project of Reclaiming Land from the Sea;
澳门海洋空间资源利用研究——澳门的填海造地工程
8.
Discussion on Tide-break & Flood-control Standards and Elevation Design for the Phase I Project of Reclaiming Fields from the Sea in Tianjin Lingang Industrial Park
天津临港工业区围海造陆一期工程防潮标准及高程设计探讨
9.
Application of Dynamic Compaction to Large Oil Tank for Sea Reclamation Project
高能级强夯在填海造陆地基处理中的应用
10.
Study on the Problem of Evaluating the Flood-Control Influence of Engineering Project of Enclosing Sea Area to Make Land in the River Mouth of New Yongding River;
永定新河口围海造陆工程防洪影响评价问题的研究
11.
Study on the Tsuen Wan Bay Further Reclamation
荃湾海湾进一步填海工程研究
12.
Case Study on the Impacts Assessment of Reclamation on Marine Environment
填海工程海洋环境影响评价实例研究
13.
The Application of Grey Interrelated Method on Technology Decision of Fill-Made Land in Tianjin Binhai New Area
灰色关联分析法在天津滨海新区吹填造陆技术决策中的应用
14.
Wan Chai Reclamation Phase 2 is under planning.
湾仔填海工程第II期仍在规划中。
15.
Central and Wan Chai Reclamation Feasibility Study
中环湾仔填海工程可行性研究
16.
The reclamation was substantially complete in 1997.
填海工程已在一九九七年大致完成。
17.
Sea-crossing hydraulic pipeline of Zhoushan diversion work from the mainland
舟山大陆引水工程跨海输水管道设计
18.
Study on the Process of Xiamen City Sea Reclamation Based on Remote Sensing Image
基于遥感影像的厦门市填海造地的进程研究