1.
Study on Body Type Optimization of Gate Slot of Jishi Gorge Middle Orifice Discharge Hollow;
积石峡中孔泄洪洞工作门槽体型优化研究
2.
Construction of the Crown Concrete of the Intersection Section of Diversion Tunnel and Middle Flood Discharging Tunnel in the Jishi Gorge Hydropower Station
积石峡水电站导流洞与中孔泄洪洞交叉段顶拱混凝土施工技术
3.
Test of Cavitation Characteristics on Service Gate Slotss for Middle Outlet Works in Jishixia Hydropawer Sation;
积石峡水电站中孔泄洪洞平面工作闸门槽空化特性试验研究
4.
Study on cavitation characteristic of working gate slots in middle spillway tunnel of Jishixia hydropower station
积石峡水电站中孔泄洪洞平板工作闸门槽空化特性研究
5.
Experimental Investigation and Numerical Simulation of Cavitation Inception in Flood-Discharge Tunnel with Orifices;
孔板泄洪洞空化初生试验及数值模拟研究
6.
Experimental Study on Energy Dissipation of Flood Discharge for Upper Hole of Double-curvature Arch Dam of Donghe Reservoir
洞河水库双曲拱坝表孔泄洪消能问题的试验研究
7.
Discussion on the Cavitation Damage of Hydraulic Design of Tunnel Spillway;
关于泄洪洞水力设计中空蚀问题的探讨
8.
Application of Block-structured Grid in Numerical Simulation of Flood Hole
分区结构网格在泄洪深孔数值模拟中的应用
9.
Application and Research of Method of Characteristics in Design of Flip Bucket for Spillway Tunnel at Xiluodu Hydropower Project
特征线法在溪洛渡泄洪洞挑流鼻坎设计中的应用研究
10.
Application of Gray System Theory in Discharge Tunnel Schedule Control at Pubugou Hydropower Station;
灰色系统理论在瀑布沟水电站泄洪洞工程进度控制中的运用
11.
Aseismatic Analysis and Optimization Design for Inlet of Diversion Tunnel;
导流泄洪底洞进口段抗震及优化分析
12.
3-D Numerical Simulation on Flood Discharge Tunnel with High Water Head and Free Water Surface;
高水头明流泄洪洞三维数值模拟研究
13.
Talking about the Engineering Geological Condition of Spillway Tunnel of Qianian Reservoir and Its Evaluation
千年水库泄洪洞工程地质条件及评价
14.
Design and Research on Flood-Discharge Power-Generating Hole of Baiyekou Reservior
柏叶口水库泄洪发电洞的设计与研究
15.
Shape optimization test of Dabeigou spillway reservior desilting tunnel
大北沟水库泄洪排沙洞体型优化试验
16.
Research and design for the transition section of the flood discharge tunnel with pressure
有压泄洪隧洞出口渐变段设计与研究
17.
Shape Study on Large-discharge Flood-releasing Energy Dissipator for Crest Spillway of Medium and Small-sized Arch Dam
中小型拱坝表孔大流量泄洪消能建筑物体形研究
18.
Research on Hydraulic Characteristics of Reconstructing Diversion Tunnel to Permanent Spillway Tunnel;
导流洞改建泄洪洞衔接段水力特性研究