说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 句库 -> 整浇梁板
1.
Experimental research on spatial effect of cast-in-situ beam-slab system under vertical loads
竖向荷载作用下整浇梁板的空间效应试验研究
2.
PUSH-OVER Analysis of the Cast-in-place Reinforced Slab Participated in Beam End Negative Moment on Frame Structures
整浇楼板板筋参与梁端负弯矩承载力后框架结构的PUSH-OVER分析
3.
The Formative Causes and Control Measures on Cracks in Cast-in-place Concrete Beams and Slabs;
现浇混凝土梁、板裂缝的成因和预防
4.
The use of hollow pots, in conjunction with reinforced concrete, reduces the dead weight and, therefore, permits a greater life load to be carried.
实心板与钢筋混凝土梁整浇在一起,可以减少自重以便承受更多的活荷载。
5.
Construction Technology of Cast-in-place Box Girder Steel Framework Integral Lifting
现浇箱梁钢筋骨架整体吊装施工技术
6.
Brief statement on general constructional skill of cast-in-place continuing box-beam
简述现浇连续箱梁整体施工技术要点
7.
Study on Influence of Beam-to-slab Relative Stiffness on Moment of Cast-in-situ Slab;
梁板相对刚度对现浇板弯矩的影响研究
8.
On the crack cause of integral cast-in-site floor and its prevention and control
现浇整体式楼盖板裂缝的产生与防控
9.
Elastoplasticity Analysis on Cast-In-Situhollow Reinforced Concrete Floor System;
现浇钢筋混凝土空心板无梁楼盖弹塑性分析
10.
Study of Load-bearing Properties of Prestressed Concrete Hollow-casted Slab-beam System;
现浇预应力空心板梁楼盖体系受力特性研究
11.
An Experimental Study of Cast-In-Situ RC Two-Way Hollow Slab on Beams;
现浇钢筋混凝土有梁双向空心板的试验研究
12.
Stochastic Analysis and Pre-control for Crevices of Sprinkle Concrete Beam Plank Construction;
现浇混凝土梁板结构裂缝的分析与预控
13.
The Under-bracing Scaffold Bearing Research of Cast-in-place Reinforced Concrete Beam and Slab Structure
现浇钢筋混凝土梁板下支撑架的受力研究
14.
Construction Method of Post-pouring Flange Plate of Simple Box Girder in Passenger Dedicated Line
客运专线简支箱梁后浇翼缘板施工工法
15.
Analyse and Control of Cracks of Prestressed Concrete Box Girder Web
悬浇箱梁节段张拉后腹板裂纹成因分析与防治
16.
Research on the effect of casting slab on frame structure column-beam intensity ratio
现浇楼板对框架结构柱梁强度比的影响研究
17.
Load Measurement of Shores in the High-Scaffold Formwork System for the Construction of Cast-in-Place Box Girder
现浇箱梁施工过程模板支撑内力实测研究
18.
Realization of Casting-in-place of Prefabricated Girders of Small Bridges and Culverts with Soluble Internal Forms
利用可溶性内模实现小桥涵板梁预制式现浇