说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 句库 -> 汛期施工
1.
Reinforcement of Cetian Reservoir construction in the flood season and flood regulation
册田水库除险加固工程汛期施工与洪水调度浅析
2.
Key Techniques for the Construction of the Pile Foundation for the Piers of the No.2 Jinjiang Bridge at Lujiawan
卢家湾锦江2号大桥水中桥墩基础汛期施工关键技术
3.
Study on Concrete Face Rockfill Dam Construction Diversion Standard and Flood Passing Measures During Construction Period;
混凝土面板堆石坝施工导流标准及施工期渡汛措施研究
4.
Optimal Design on Gongboxia Hydro-Power Station Construction During Flood Perind;
公伯峡水电站施工度汛方案优化设计
5.
Construction Techniques of Diaphragm Wall Considering the Protecting of Flood Prevention Wall
基于防汛墙保护的地下连续墙施工技术
6.
Application of non-engineering measure in the flood control operation of mountain area
非工程措施在山区县防汛调度中的应用
7.
The Difficulties of Current Flood Control Work in Yulin and the Countermeasures
玉林市当前防汛工作的难点与应对措施分析
8.
Design of Flood-period Passing for Flood Retarding Gate in Nanxijiang Water Supply Works
楠溪江供水工程拦河闸施工度汛方案的设计与实施
9.
A Breif Analysis of Quality Control of the Mud-gravel Flood Road Construction in Shulu Trunk;
舒庐干渠渠堤泥结碎石防汛道路施工质量控制浅析
10.
Construction Technology for Bored Pile Close to the Flood Wall through Riprap Layer
紧贴防汛墙并穿越抛石层的钻孔灌注桩施工技术
11.
Applicants for approval to install outdoor advertising facilities shall keep the facilities clean, tidy and in good condition, and shall make replacements and repairs whenever necessary.
并定期对户外广告设施进行安全检查,遇台风、汛期应当采取安全防范措施。
12.
More attempts will be made in the retention of rainwater and flood for underground recharge during rainy season, in order to restore and conserve underground water sources.
做好汛期雨洪的拦截及回灌工作,补充、涵养地下水源;
13.
Without a way to release most of this mud, the reservoir would silt up and possibly collapse.
工程师在大坝底部设计了23道闸门用于在汛期冲走泥沙。
14.
The Research on Influence of Peaking Operation of TGP Hydropower Station in Flood Period on the Upstream Navigation Conditions;
三峡工程电站汛期日调节对上游通航水流条件的影响研究
15.
Characteristic Analysis of Precipitation in Rainy Season in Fujian Province and Research of Artificial Neural Network Forecasting Model;
福建省汛期降水的特征分析及其人工神经网络预测模型的研究
16.
Flood Season Division and Reansonable-Determination of Limited Water Level of Cascade Resevoirs;
梯级水库汛期分期及汛限水位合理确定研究
17.
Fuzzy Division of Flood Season and the Determination of Its Flood Control Water Level of Reservoir
水库汛期模糊划分及其分期汛限水位的确定
18.
Fuzzy Partition of Flood Season and Determination of Limited Water Level on Zhangze Reservoir;
漳泽水库汛期模糊划分及汛限水位的确定