说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 句库 -> 造斜段
1.
Establishment and solution of the vibration equation on the bending drill string in horizontal wells' whipstocking section
水平井造斜段弯曲钻柱振动方程的建立及求解
2.
Transformation of Superficial Complex Section in Main Inclined Shaft of Yuejin Coal Mine
跃进煤矿主斜井浅表复杂地段的改造
3.
slope error over 10%
段的斜率误差10%
4.
rayon twill snowsuit
人造丝斜纹绸雪衫裤
5.
Hall-Rowe wedging method
霍尔-罗人工造斜方法
6.
bottom-trip casing whipstock
井下移动式套管造斜器
7.
The Structure Geometry Analysis and Modeling of Huoerguosi Anticline
霍尔果斯背斜的构造分析与构造建模
8.
The compact fold structure area, anticline and. syncline in North Guizhou are often in opposite arrangement.
贵州北部紧密褶皱构造区,背斜、斜常呈相间排列。
9.
The construction technology of Pengxi river cable stayed bridge side span cast-in-place section and closure section
彭溪河斜拉桥边跨现浇段及合龙段施工工艺
10.
Selection of Reasonable Section Heights During Top-coal Caving to Steep Seams
急斜煤层分段放顶煤开采合理段高选择研究
11.
Study of Existing Slopes--Stage I General Revie
现存斜坡研究第一阶段概略检讨
12.
a sloping chute down which children can slide.
一段儿童可以滑行的有坡度的斜道。
13.
Study on Cable Tension Optimization of Cable-stayed Bridge in Segmental Scaffold Construction Method;
支架节段现浇法斜拉桥索力优化研究
14.
Wind-induced Vibration Control of Large Span Cable-stayed Bridge under Construction;
大跨度斜拉桥施工阶段风振控制研究
15.
Research on Stiffness Matching of the Joint of Composite Cable-stayed Bridge;
混合梁斜拉桥结合段刚度匹配的研究
16.
Research on Mechanical Properties of Suifenhe Cable-stayed Bridge under Level Rotation;
绥芬河斜拉桥水平转体阶段受力研究
17.
Optimization of Cable Tension during the Construction for Cable-stayed Bridges;
斜拉桥施工阶段索力确定的优化方法
18.
Study on Mechanical Characteristics for Segment of the Anchorage Zone Segment of Cable-Stayed Bridge Tower
斜拉桥索塔锚固区节段受力特性研究