1.
Application of 3D Seismic Prospecting in Seismic Geological Condition Complex Coalmine Areas
三维地震勘探在复杂地震地质条件煤矿区的应用
2.
The Near Vertical Reflected Seismic Data Acquisition and Processing in Complicated Geological Condition in the Tibetan Plateau;
青藏高原复杂地质条件近垂直反射地震资料采集与处理
3.
Study on the Computation Method of Seismic Traveltimes Including Surface Topography;
复杂地表条件下地震波走时计算方法研究
4.
Splicing Processing Technology of 2D Seismic Data Under Complex Surface Condition
复杂地表条件下二维地震资料拼接处理技术
5.
Complicated geological condition fabrication cost of foundation works control;
复杂地质条件下基础工程的造价控制
6.
High efficiency coal mining technology used under complicated geological conditions
复杂地质条件下工作面高效开采技术
7.
Full-mechanized Mining Technology under Complex Geological Condition
复杂地质条件下综采工作面回采技术
8.
Application of Rigid Pile Composite Foundations Under Complicated Geologic Condition
复杂地质条件下的刚性桩复合地基应用
9.
Technique on Geological Predication for Super Long Tunnel in Advance in Complicated Geological Conditions
复杂地质条件下长大隧道超前地质预报技术
10.
The Study of Seismic Acquisition Method in Complicated Structural Background;
地质构造复杂地区地震采集方法研究
11.
Discussion on Foundation Design of Super Length Basement Under Complicated Karst Geological Conditions
复杂溶岩地质条件下超长地下室基础设计探讨
12.
The research and application of surveying methods in the high accuracy geophysical exploration under complicated earth surface
复杂地表条件下高精度地震勘探测量方法的研究与应用
13.
The geologic effect of 3D seismic prospecting for complex minor fault block,
三维地震勘探复杂小断块的地质效果
14.
Study of Prestack Migration Image on Complex Geologic Body;
复杂地质体的地震波场成象方法研究
15.
A few complex geological environments are discussed in a later section.
下一节中还要讨论几种复杂的地质条件。
16.
The engineering geological conditions of the Badong Changjiang Highway Bridge are very complex.
巴东长江公路大桥桥址区工程地质条件复杂。
17.
The Application of Variable Section Man-dig Piles in Complicate Geological Condition
变截面人工挖孔桩在复杂地质条件中的应用
18.
Application of Press Bele Installation Rubbercoated Draper on the Complicat Geology
复杂地质条件下胶带输送机压带装置的应用