1.
Precast segmental with matching joints is as among the fastest.
采用镶合缝制块件的分段拼装方法则是其中最快的一种。
2.
Seismic Performance Analysis of a Continuous Girder Bridge with Precast Segmental Bridge Columns Using Match-cast Dry Joints
干接缝节段拼装桥墩连续梁桥地震反应分析
3.
Seismic Analytical Model of Segmental Bridge Column with Match-cast Epoxy Joints
胶接缝连接的节段拼装桥墩抗震分析模型
4.
Cyclic Tests Study and Nonlinear Finite Element Analysis on Seismic Behavior of Prestressed Precast Segmental Bridge Piers;
节段拼装预应力混凝土桥墩拟静力试验和分析研究
5.
Each succeeding fabricated box is erected on trolleys.
每段预拼的箱梁安装在小平车上。
6.
Review of Segmental Assembling Construction Technique of Mobile Support
移动支架节段拼装施工技术方法综述
7.
Alignment Control for Short-line Precast Segmental Bridges
短线法节段预制拼装桥梁线形控制探讨
8.
Technology Research for Steel Box Girder Fabrication and Preassembly of E Dong Yangtze River Bridge
鄂东大桥钢箱梁梁段制造及预拼装技术研究
9.
Construction technology of box-girder segment bricolage of traversing carriage bridge fabrication machine
移动支架造桥机箱梁节段拼装施工技术
10.
Comprehensive Application of Construction Techniques for Segmental Precasting and Cantilever Assembling to Bridge Works
节段预制、悬臂拼装工艺在工程中的综合运用
11.
Construction Technology for Beams of Steel Box Girder and Site Assembly of the Closure Segment
钢箱梁横梁及合龙段现场拼装施工技术
12.
Recall & Development and Outlook of the Railway Bridge Segments Assembled Machine
铁路桥梁节段拼装造桥机回顾、发展与展望
13.
On Box Girder Precast Segment Assembling by Short-line Method & Alignment Control Technological Principle
短线法箱梁节段预制拼装及线形控制技术原理
14.
Finite Element Analysis of Bearing in Segment Erector System for TBM
TBM管片拼装系统轴承有限元分析
15.
ON SOLVING BROKEN RIGID BODY SPLICING PROBLEM BY LEVEL AND SEGMENT DIVIDING TECHNOLOGY
利用分级分段技术解决破碎刚体拼接问题
16.
FINITE ELEMENT ANALYSIS OF BEAM-TO-COLUMN CONNECTION WITH CANTILEVER BEAM BOLTED-SPLICING
带悬臂梁段拼接的梁柱连接有限元分析
17.
Automatically stitching spherical panoramas with piecewise interpolation
采用分段插值的球状全景图自动拼接方法
18.
Cable installation for reinforced concrete box arch bridge of Liuguihe large Bridge
六圭河大桥钢筋混凝土箱形拱桥多节段缆索吊拼装施工技术