说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 句库 -> 三量程
1.
The design of BESIII EMC charge measurement with three ranges
BESIII电磁量能器三量程电荷测量方案
2.
Quality Management for the Third Phase Construction of Three Gorges Project
长江三峡水利枢纽三期工程质量管理简介
3.
Quality of Three Gorges Project Up to Required Standard
三峡工程质量符合设计要求
4.
Qinshan Phase Ⅲ (CANDU) Nuclear Power Porject Quality Assurance
秦山三期(重水堆)核电站工程质量保证
5.
Study on Environmental Capacity of Migrate of Chongqing Reservoir of Three-Gorges Project;
三峡工程重庆库区移民环境容量研究
6.
Multi-armed Spiral Waves in Three-component Reaction Diffusion Systems
三变量反应扩散方程中的多臂螺旋波
7.
The Application of Trigonometric Leveling and GPS in River-crossing Leveling
三角高程、GPS在跨河水准测量的应用
8.
Probe into the Quality Control of the Highway Project--Constructing the Three-level Quality Guaranteeing System;
公路工程质量管理初探——建立三级质量保证体系
9.
Chat in the mechanics "Three great theorems "Measure against the process 、Condition amount relationship;
谈力学中的“三大定理”与过程量、状态量的关系
10.
Analyzing for Measuring Errors in Tri-ordinate Measuring Machinery in Reverse Engineering
逆向工程中三坐标测量机的测量误差分析
11.
Precision Analysis of Total Station Trigonometric Leveling Replace Leveling
全站仪三角高程测量替代水准测量的精度分析
12.
Trigonometric Leveling in JNCORS Observation Monument Height Survey
三角高程测量在JNCORS系统观测墩高程测量中的应用
13.
coming next after the third and just before the fifth in position or time or degree or magnitude.
在时间、程度、数量上位于第三之后第五之前。
14.
Typical composition of blast furnace gas measured by PMS is shown below in table 3.
图三为由过程质谱测量的高炉中的组分。
15.
Study on Concrete Quality Control in the Floor the Three Structure of Gorges Project s Permanent Ship-locks;
三峡永久船闸地面工程混凝土质量控制与研究
16.
An Engineering Measurement Method for the 3-Dimensional Object Surface with FTP;
FTP三维物体表面轮廓工程测量方法的研究
17.
Applied Research of the Total Station Elevation Surveying Using Midway Method in Precise Trigonometric Leveling;
全站仪中间法在精密三角高程测量的应用研究
18.
Analysis and Improvement on Local Optimization of Incremental Delaunay Triangulation;
增量Delaunay三角化算法局部优化过程的分析与改进