说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 句库 -> 现浇段
1.
The construction technology of Pengxi river cable stayed bridge side span cast-in-place section and closure section
彭溪河斜拉桥边跨现浇段及合龙段施工工艺
2.
Design and Construction of Cast-in-place Support in Large Length and Altitude and in Large Tonnage
大长度大高度大吨位现浇段支架设计与施工
3.
Design and Construction Technology of the Cast-in-place Support at the Side-spans of a Continuous Rigid Framde Bridge
连续刚构桥边跨现浇段支架法设计及施工技术
4.
Constructional scheme and technical features of Xintan Bridge beam cast-in-place rigid frame paragraph
新滩大桥刚构梁现浇段施工方案及技术特点
5.
The Design and Prefabrication of the Support Steel Pipe Scaffold for Cast-in-situ Prestressed Continuous Box Beam
预应力混凝土连续箱梁现浇段组合式高支架设计及施工技术研究
6.
Study on Cable Tension Optimization of Cable-stayed Bridge in Segmental Scaffold Construction Method;
支架节段现浇法斜拉桥索力优化研究
7.
In-situ Monitoring Technology on Continuous Rigid Frame Cantilever Casting Beam
连续刚构悬臂浇筑段的现场测控技术
8.
Cable Force Optimization of Cable-stayed Bridge Casting in Place on All Supported Framework and Definition of Construction Stage Cable Force
支架现浇斜拉桥索力优化及施工阶段索力确定
9.
Finite Element Stress Analysis of Cast-in-Situ Slabs During Construction
施工阶段现浇楼板应力状态的有限元分析
10.
The first of the site concrete pumps with an output of 132 kW is set up several sections to the rear on the already finished concreted roadway surface.
第一台现浇混凝土泵,功率132 kW,放在已浇注混凝土上,距布料机数段路面板处。
11.
The successful alternative was the cast-in-place segmental prestressed concrete box girder.
最后采用的方案是分段现浇的预应力混凝土箱形梁。
12.
Emergence and control of cracks in cast-in-place concrete structure at construction stage;
现浇混凝土结构施工阶段塑性裂缝的产生和控制
13.
It's the first time in China that bridging machine is applied in casting box girder of over-sea construction during Donghai Bridge neriticregion.
东海大桥浅海段是国内第一次运用造桥机技术在海上施工现浇箱梁。
14.
Do you have to water it now?
你一定得现在浇吗?
15.
cast-in-situ concrete construction
现浇钢筋混凝土施工
16.
cast-in-site concrete technique
混凝土现浇施工技术
17.
The concrete pump is only relocated after a number of sections have been completed.
浇注完数段路面板后,才移动混凝土泵。
18.
The concrete pouring and temperature control technology in plugging segment of diversion tunnel
导流洞封堵段混凝土浇筑及温控技术