1.
The Research on Fuzzy Network Planning Technology and Fuzzy Schedule Risk
![点击朗读](/dictall/images/read.gif)
模糊网络计划技术及模糊工期风险研究
2.
Calculating Method of Fuzzy Construction Time of Lapping Network with Single Number;
![点击朗读](/dictall/images/read.gif)
单代号搭接网络模糊工期的计算方法
3.
Fuzzy Analysis of Time-limit and Its Application in Production Scheduling System;
![点击朗读](/dictall/images/read.gif)
模糊工期分析及在生产作业计划系统中的应用
4.
Study on Method for Buffer Placing in Critical Chain Management with Fuzzy Duration
![点击朗读](/dictall/images/read.gif)
基于模糊工期的关键链缓冲区设置方法研究
5.
An Analysis of Period Risk Based on Fuzzy Synthetical Evaluation Method
![点击朗读](/dictall/images/read.gif)
基于模糊综合评判法的工期风险分析
6.
Using Random Fuzzy-set Method Studies Rationally Deciding Deadline for a Project;
![点击朗读](/dictall/images/read.gif)
用随机模糊方法研究合理确定工程项目工期
7.
Fuzzy Tradeoff Optimization of Time-Cost-Quality in Construction Project;
![点击朗读](/dictall/images/read.gif)
工程项目工期成本质量模糊均衡优化研究
8.
Analysis of total duration's membership function and path criticality in a fuzzy network
![点击朗读](/dictall/images/read.gif)
模糊网络总工期隶属函数及路径关键度分析
9.
Risk assessment of deep excavation during construction based on fuzzy theory
![点击朗读](/dictall/images/read.gif)
基于模糊理论的深基坑施工期风险评估
10.
The Risk Influence Analysis of Project Due Date Base on Fuzzy Probability
![点击朗读](/dictall/images/read.gif)
基于模糊概率的项目工期风险影响分析
11.
Research on the risk evaluation model of project duration based on PERT and Fuzzy Theory;
![点击朗读](/dictall/images/read.gif)
基于PERT与模糊数学的项目工期风险等级评价模型研究
12.
Production Planning with Fuzzy Due Data for Multi-Location OKP Manufacturing Systems;
![点击朗读](/dictall/images/read.gif)
基于模糊交货期分布式多工厂单件制造业的生产计划
13.
A method to confirm maintenance period of plateau construction machinery based on fuzzy comprehensive evaluation
基于模糊综合评价的高原工程机械保养周期确定方法
14.
Application of F-PERT to Evaluation of Building Period for Ocean Structure
![点击朗读](/dictall/images/read.gif)
模糊型计划评审技术在海洋结构建造工期估算中的应用
15.
Applications of Fuzzy Math. in Civil Engineering ?
![点击朗读](/dictall/images/read.gif)
模糊数学及其工程应用
16.
The Pricing for a Class of Barrier Options under Non-Fuzzy or Fuzzy Condition;
![点击朗读](/dictall/images/read.gif)
非模糊与模糊状态下的一类障碍期权定价
17.
A Fuzzy Binomial Tree Model with European Call Options Pricing;
![点击朗读](/dictall/images/read.gif)
关于欧式看涨期权的模糊二叉树模型
18.
The Solution of the Shortest Path Problem with Fuzzy Expectation Model;
![点击朗读](/dictall/images/read.gif)
用模糊期望值模型求解最短路径问题