1.
Behavior Law of Mine Pressure in Roadways Under Conditions of Mining With Coal Pillars
带煤柱开采条件下巷道矿压显现规律
2.
Evaluation method for pillar stability during strip mining in multiple coal seams
多煤层条带开采煤柱稳定性评价方法研究
3.
Study on the Coal Pillar Stability of Deep and High Seam Strip-Partial Mining and Its Impact on the Village in Gucheng Coal Mine;
古城煤矿深部厚煤层条带开采煤柱稳定性及对村庄的影响研究
4.
Study on Pillars Stability by Keeping Water in Strip Mining for Small and Medium-sized Mines in Northern Shanxi Province
陕北中小矿井条带保水开采煤柱稳定性研究
5.
Numerical Simulation and Calculation on Plastic Zone Width of Coal Pillar for Strip Mining
条带开采煤柱塑性区宽度的数值模拟与计算
6.
Numerical Study on Substitution Extraction in Coal Pillar of Strip Mining
条带开采留设煤柱置换开采方法的数值模拟研究
7.
Study on the Reclimaning of Fault Waterproof Coal Pillar in Mafang Mine;
马坊煤矿断层防水煤柱开采回收研究
8.
Optimization of the Design of Mining Area and to Mine Reasonably the Coal-Pillar of Mine Surface Plant;
优化采区设计 合理开采工业广场煤柱
9.
Study on Stress State of Wide Strip Pillar in Gobs of Deep Mines
深井采空区宽条带煤柱受力状态研究
10.
Combin gateway and pillar with fully mechanized top cawing mining technology in steep inclined special thick seam
急倾斜较薄特厚煤层巷柱-综采放顶煤开采技术
11.
Experimental Simulation and Numerical Analysis of Partial Extraction Pillar Stability--A Case Study of Taiping Coalmine, Jining City, Shandong Province
条带开采煤柱稳定性的试验模拟与数值分析——以山东省济宁市太平煤矿为例
12.
Research of Security Mining Technology for Coal-Pillar Below Railway Bridge;
铁路桥下工业煤柱安全开采技术研究
13.
Application of the non-coal column recovery technology in fully mechanized top coal caving mining face
无煤柱开采技术在综放工作面的应用
14.
Principal Technology Study on Pillor Mining under the System of Room and Pillor Mining;
房柱式开采体系煤柱回收关键技术研究
15.
Study on Technology of Top-coal Caving Mining of Lane Pillar in 3.5~10m Steeply Inclined Coal Seam;
3.5~10m急倾斜煤层巷柱式放顶煤开采技术研究
16.
Failure Characteristic of Residual Coal Pillar and Its Influence on Downward Mining
残留煤柱破坏特征及其对下部煤层开采影响
17.
Feasibility on the upward mining of the left-over coal above goaf with pillar supporting method
刀柱采空区上方遗弃煤层上行开采可行性判定
18.
Feasibility Study and Mining Measures on Coal Pillars Mining Under Surface River Water Body
地表河流水体煤柱回采可行性研究及开采措施