1.
Study on Activity Float Transitivity in Activity-on-Arc Network Planning
双代号网络计划中工序机动时间传递性研究
2.
Study of activity float spread property in activity-on-arc network planning
双代号网络计划中工序机动时间蔓延性研究
3.
Application of Double-Symbol Network Planning to Niutoushan Project;
双代号网络计划在牛头山电站施工工期中的应用
4.
Application of Time-scaled Network in Project Management;
双代号时标网络计划在项目管理中的应用
5.
Drawing Network Planning Graph of Activity-on-Arrow Network Based on Particle Swarm Optimization
基于粒子群优化算法的双代号网络进度计划图的绘制
6.
The Method of Compiling Arrow Diagramming Method Based on EXCEL Platform;
基于EXCEL的双代号网络图编制方法
7.
Calculating Method of Fuzzy Construction Time of Lapping Network with Single Number;
单代号搭接网络模糊工期的计算方法
8.
A heuristic activity-on-arrow network autogeneration algorithm
一种启发式双代号网络图自动生成算法
9.
Discussion for Expressions About Time Parameter Relation of Activity-on-arrow Network;
对双代号网络图时间参数关系表达方式的讨论
10.
Adding Skills of Dummy When Drawing Network Drafts;
绘制双代号网络图时虚工序的添加技巧
11.
Application of Dummy Arrow in Flow Process Network;
虚箭线在双代号流水作业网络图中的应用分析
12.
Judgment Method of Dummy Activity Predigesting in Activity-on-arrow Network
双代号网络图中虚工作的简化判断方法
13.
New Development of Enterprise Resource Planning in Internet Era;
网络时代企业资源计划ERP的新发展
14.
Application of Dual Code Number Schedule Plan in Management of Construction Project
双代号进度计划在施工项目管理中的应用
15.
Bi-level fuzzy chance constrained programming model for the production planning of the two-echelon distribution network in supply chain;
供应链二级分销网络生产计划双层模糊机会约束规划模型
16.
Technical specification for engineering network planning
工程网络计划技术规程
17.
An Optimization Model for Two-echelon Distribution Network Design in Supply Chain Based on Bi-level Programming;
基于双层规划的供应链二级分销网络优化设计模型
18.
In Singapore, dedicated Net users are planning to maintain unfettered access by jumping borders and dialing services in neighboring Malaysia.
新加坡的网络迷正计划跨越国界,使用邻国马来西亚的拨号服务,以确保网络上的自由使用权。