1.
Environmental Protect Considerations of the Layout of Control Works of Shannipo Hydropower Station on the Beipan River
北盘江善泥坡水电站枢纽布置环保考虑
2.
Recheck stability of left bank slope at water intake of Baise HPP
百色水电站进水口左侧边坡稳定复核
3.
Analysis of cracks on cement poles of Taipingwan hydropower station and its reinforcement
太平湾电站变电站水泥杆裂缝分析及加固
4.
Application of Computer Monitoring and Control System of Zhangfeng Reservoir’s Headwork Hydroeleciric Station,Pumping Station and Chuanpo Hydroelectric Station
张峰水库渠首电站及泵站和川坡水电站计算机监控系统应用
5.
Study on Stability of Approach Channel Slope for Jinping I Hydropower Station
锦屏一级水电站引渠边坡稳定性研究
6.
Geology evaluation of the slope project on diversion pipe section of one power station
某电站引水明管段边坡工程地质评价
7.
Primary Analysis of the Rear Slope Stability of Shimenkan Hydropower House
石门坎水电站厂房后边坡稳定性初判
8.
Comprehensive treatment of Fanai landslide of Lubuge hydropower station
鲁布革水电站发耐滑坡综合治理实施
9.
Study on values of landslide group parameters about Qianchang in a hydropower station
某水电站铅厂滑坡滑带参数取值研究
10.
Quantitative Study of Stress-release Zone of Low-elevation Slope in a Certain Hydroelectric Station
某水电站低高程岸坡卸荷带量化研究
11.
Stability assessment of No.4 landslide at Cihaxia hydropower station
茨哈峡水电站Ⅳ~#滑坡稳定性研究
12.
An Experiment of Sediment Model for Diluo Hydropower Station in the Xixi River;
西溪河地洛水电站泥沙模型试验研究
13.
Experimental Research on Sediment Model of Burma Shweli Hydropower Station
缅甸瑞丽江水电站泥沙模型试验研究
14.
Experiment and application of cement-based grout material in Tianwan NPP
田湾核电站水泥基灌浆料试验与应用
15.
Study of Sediment Accumulation and Diversion of Water to Control Sediment in Hydropower Stations in Mountain River
山区河流引水式电站水库泥沙淤积及电站引水防沙问题研究
16.
Water Guiding Tunnel Slope Stability Analysis in Right Bank in JinChuan Hydro-power Station;
金川水电站右岸导流洞进水口边坡稳定性评价
17.
Research on Slope Stability of Intake Slope on Right Bank of Jinping Ⅰ Hydropower Station;
锦屏一级水电站右岸进水口边坡稳定性研究
18.
The Stability Analysis of the In-Outflow Slope of Shuangjiangkou Hydroelectric Power Station;
双江口水电站进出水口边坡稳定性分析