1.
Discussion on application of tunnel boring machine(TBM) to construction of water conveyance tunnel
浅议全断面隧洞掘进机在引水隧洞施工中的应用
2.
Application of full-face TBM on the international tender sections II and III of the southern artery in the Yellow River diversion project
全断面隧洞掘进机在引黄工程南干线国际Ⅱ、Ⅲ标中的应用
3.
Application Research of Shield Tunnel Boring Machine on Soft and Hard Rock Engineering in Osaka Tunnel
双护盾全断面掘进机在大坂隧洞软硬岩工程中的应用研究
4.
Manufacture and Quality Control of Lining Segment of a Construting Tunnel Constructed by TBM
TBM全断面掘进隧洞预制管片的施工及质量控制
5.
pattern recognition of full face TBM boring performance
全断面隧道掘进机掘进状况分类识别研究
6.
Study on Pattern Recognization of Tbm Boring Performance of Qinling Tunnel;
秦岭隧道全断面掘进机掘进状况识别分析研究
7.
Study of Cutter Layout Design of Full-face Rock Tunnel Boring Machine
全断面岩石隧道掘进机刀盘刀具布置方法研究
8.
On Measures to Overcome Difficult Encountered in Weak Stratum during Construction Stage of Tunnel Built by Double-shield Tunnel Boring Machine
双护盾全断面掘进机(TBM)遇软岩洞段的解困方案
9.
Backfill Grouting in Pea Gravel Layer behind Lining of Tunnel Constructed by TBM and Its Quality Control
隧洞工程全段面掘进机施工的豆砾石回填灌浆及质量控制
10.
Theoretical Analysis of Special Section Tunnel Cutting Mechanism of Shield Machine;
盾构掘进机异形断面隧道切削机构的理论研究
11.
Poor-geology consolidation grouting in double-shielded TBM full face tunnelling
双护盾TBM全断面掘进不良地质洞段固结灌浆
12.
On construction of TBM machine in tunnel
浅谈硬岩双护盾掘进机(TBM)隧洞施工
13.
Study on the Consecutive Boring Principle of the Open Type Full Face Rock Tunnel Boring Machine;
敞开式全断面岩石掘进机连续掘进原理的研究
14.
Study on transportation system of long and large tunnel construction by TBM
长大隧洞掘进机施工洞内运输系统研究
15.
There are mainly two kinds of roadheader: Tunnelling Boom Machine(TBM) and partial-size tunneling machine.
掘进机按照对于巷道断面的作用方式可划分为两种:全断面掘进机和部分断面掘进机。
16.
In some cases, work on the main tunnel progresses a few meters behind the pilot tunnel so that the latter provides ventilation, always a major problem in tunneling operations.
有时,主隧道的掘进紧跟在导洞掘进后面几米,由导洞提供通风。通风一直是隧道掘进中的大问题。
17.
Design principle of hydraulic system on whole section tunneler and the application of proportional technique are introduced in this article, starting from a typical system.
本文从一个典型系统人手,介绍全断面隧道掘进机液压系统的设计原则和比例技术的应用。
18.
Study on Drive System of the Full-face Rock Tunnel Boring Machine;
全断面硬岩掘进机(TBM)驱动系统的研究