说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 句库 -> 人工挖孔接桩法
1.
Application of manual hole digging connecting method in PHC Piles Reinforcement
人工挖孔接桩法在PHC桩加固的应用
2.
Constructionmethods of Artificial Digged-hole Pile Crossing Deep Silt Layer
人工挖孔桩穿越深淤泥层的施工方法
3.
Application of Complex Grouting method in Man-dig pile Construction
综合注浆法在人工挖孔桩施工中的应用
4.
On the construction methods of safety and quality in the manual-excavation pile construction
人工挖孔桩施工中安全和质量处理方法
5.
The grouting curtain method in treating severe mobile sand occurred in artificial spaded pile
注浆帷幕法对人工挖孔桩出现流沙现象的治理
6.
The safety technologies of the hole of manually dig cast-in-place pile
浅谈人工挖孔灌注桩成孔的安全技术
7.
Explosive Excavation Technique in Manual Excavation Piles;
爆破成孔技术在人工挖孔桩中的应用
8.
Application of Seismic Imaging Method in the Testing of Manual Hole-Digging Pile Foundation and Rock Mass Integrity
地震映像法在人工挖孔桩孔底岩层完整性检测中的应用研究
9.
Construction of manual excavation pile for Guangyinge commercial apartment building of Guilin City
桂林市观音阁商住楼人工挖孔桩施工
10.
Construction technology and safety management of Hand-dug pile
浅谈人工挖孔桩施工技术及安全管理
11.
Special Treatment in Construction of Manual Pile Foundations
人工挖孔桩施工中几个特殊问题处理
12.
Key Points in Construction Management of Manual Holing Pouring Pile
人工挖孔混凝土灌注桩施工管理要点
13.
Cause of Artifical Dig-in-place Piles Failure and Summary Experience
人工挖孔桩施工常见问题及处理措施
14.
Wall-Supporting Method of Clough Soil Section in the Construction of Excavated Pile
浅谈坳沟土段挖孔桩施工的护壁方法
15.
Technology of Treatment of Pile Foundations Intruding into Shield Tunnel by means of Manual-cut Borehole Method
侵入盾构隧道桩基人工挖孔处理技术
16.
LARGE DIMETER AND OVERDEPTH STAKE BASE OF DONE MAN DIG HOLE COMSTRUCTION STUDY IN COMPLICATED LOCAL
复杂地层超深大孔径人工挖孔桩施工的探讨
17.
Post Grouting for Hand Dug Piles with the Pipe Driven at the Pile End
人工挖孔灌注桩桩底打管后注浆技术及应用
18.
Vibro Replacement Stone Column and Artificial Drilled Piles Used to Reinforce the Soft Soil Foundation of Buildings;
振冲碎石桩与人工挖孔桩加固建筑软基