1.
The mechanism and prevention technology of the inrush water disaster warning of karst tunnels
岩溶隧道涌突水灾害预警与防治技术
2.
Study on Transport of Groundwater of Jinping Cascade Ⅱ Hydropower Station with Long Diversion Tunnel
锦屏二级水电站引水隧洞施工期涌突水数值模拟
3.
Karst Region Groundwater Catchment Feature in Southwest China and Control Action on Cross-mountain Tunnel
西南岩溶山区汇水条件及其对越岭隧道涌突水的控制作用
4.
Research on the Jiezipo Syncline Karst Water System and Hazard of Water-gushing-and-bursting in Tunnel
街子坡向斜岩溶水系统及隧道涌突水危险性研究
5.
Research on Stability Analysis and Water Inflow Disasters Treatment in the Tunnel with High Overburden;
深埋公路隧道稳定性监测分析及涌突水灾害防治研究
6.
Study on the Estimation of Waterinflow and Waterburst in Niba Amountaxiangling Tunnel and Fault of Yaan-Lugu Highway
雅泸高速公路泥巴山隧道及断层涌突水预测研究
7.
WATER INRUSH COEFFICIENT-UNIT INFLOW METHOD FOR WATER INRUSH EVALUATION OF COAL MINE FLOOR
煤矿底板突水评价突水系数–单位涌水量法
8.
Tears started to her eyes.
她的眼睛里突然涌出了泪水。
9.
Tears started to (ie suddenly came into) her eyes.
她的眼睛里突然涌出了泪水.
10.
Analysis, Simulation and Application of Water Inrush System in Mine Area;
煤矿区突(涌)水系统分析模拟及应用
11.
Asseeement of collapse disater during tunnel construction in a underground-water tunnel
某水下隧道施工突涌水与塌方的风险评价
12.
Numerical simulation of water invasion of No.5 Mine in the Fengfeng Coalfield
峰峰五矿底板突水数值模拟及涌水量预测
13.
To flow suddenly and abundantly, as from containment;flood.
奔流突然且充足地流出,如从围墙中涌出;洪水
14.
Fuzzy Safety Evaluation for Water Bursting and Mud Surging of Tunnels through the Fault Fracture Zones
隧道穿越断层破碎带突水涌泥模糊安全评价
15.
Analysis on Inhibiting Factors of Inrushing Plastic Failure Caused by Confined Water in Foundation Pit
承压水引发基坑突涌塑性破坏抑制因素分析
16.
On analysis of reasons for mud break out in tunnel karst in Tianchi and its regulation measures
天池隧道岩溶涌水突泥成因分析及整治措施
17.
The Research of One Karst Tunnelwater-Inrush Amount Forecast and Effect Evaluation of Wuhan~Guangzhou High-Way in Shaoguan;
武广线韶关段某岩溶隧道涌(突)水量预测及对施工影响评价
18.
The Research of One Karst Tunnel Water-Inrush Amount Forecast Methods of Wuhan~Guangzhou High-Way in Shaoguan
武广线韶关段某岩溶隧道涌(突)水量预测方法研究