说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 句库 -> 衬砌厚度
1.
Effect of lining thickness lack on lining safety for highway tunnel
公路隧道衬砌厚度不足对衬砌安全性影响
2.
The Probability Distribution Rule of Highway Tunnel Concrete Construction Thickness and Reliability Analysis;
隧道二次衬砌厚度概率分布特征与可靠度分析
3.
Research on Critical Failure Vibration Velocity of Concrete Lining in Different Thickness Under the Acting of Blasting Vibration
不同厚度砼衬砌的爆破临界振速研究
4.
The Surveillance and Study of Thermal-Creep Stress of the Thick Concrete Liners with Big Diameters during the Construction in the TGP;
三峡工程大洞径、厚衬砌混凝土施工期监测及温度徐变应力研究
5.
No Destructive Testing by GPR Method on Thickness of Concrete Channel Lining in the East Route of The South-to-North Water Transfer Project
南水北调东线渠道衬砌混凝土厚度GPR快速无损检测
6.
Research on Laying Structure Strength of Underground Parking lot by Means of Photoelasticity Experiment
地下停车场衬砌结构强度的光弹性试验研究
7.
Distribution Law of Temperature Field and Research on Frost Heave Force Action on Tunnel Lining
季冻区隧道温度场分布规律及衬砌冻胀力分析
8.
Research of the Stability and Reliability of Surrounding Rocks in the Process of Gonghe Tunnel's Construction
共和隧道施工围岩稳定性及衬砌可靠度研究
9.
Reliability Analysis of Tunnel Lining Stability Based on Kriging Algorithm
基于Kriging算法的隧道衬砌稳定可靠度分析
10.
Influences of Lining Stiffness Distribution on Frost Heave Pressure on Cold Regional Tunnels
寒区隧道衬砌刚度分布对冻胀压力的影响
11.
Discussion of method of calculating crack width of permeable lining of pressure tunnel
压力隧洞透水衬砌裂缝宽度计算方法探讨
12.
Analysis of the Longitudinal Thermal Stress of the Lining Structure of Subway Tunnel during Traffic Operation
运营期间地铁隧道衬砌结构纵向温度应力分析
13.
Supervision of Furnace Thermal Current Intensity and Prediction of Furnace Lining Thickness;
高炉热流强度的监测与炉衬厚度预报
14.
refractory lining
耐火衬砌, 耐火炉衬, 耐火(材料)衬里
15.
Research of Temperature Fields and Thermal Stress for Yangtze River Tunnel by Fire Load;
火灾作用下长江隧道衬砌结构温度场和温度应力研究
16.
Simulation of temperature field and thermal stress of pubugou divertion tunnel during construction
大型泄洪洞衬砌混凝土施工期温度场和温度应力的仿真计算
17.
"Wet sprayed concrete for supporting purposes during the drive, in situ concrete for the up to 3 m thick Base and for lining the vault."
掘进过程中的支护采用湿喷混凝土,3米厚的基底和穹拱衬砌采用浇注混凝土。
18.
Calculation Method of CFRP Strengthened Highway Tunnel Lining Based on Reliability Theories;
基于可靠度理论的碳纤维加固公路隧道衬砌计算方法的研究