1.
Research on forward simulation of tunnel lining cavity GPR images
隧道衬砌空洞探地雷达图谱正演模拟研究
2.
Analysis on Cause of Liner Rear Cavity Failure of Ocher Tunnel Lining;
黄土隧道衬砌背后空洞对隧道衬砌结构影响分析
3.
Scattering and Diffraction of Cylindrical Lined Cavities in Half-space Subjected to P & SV Waves;
半空间中圆形衬砌洞室群对平面P波和SV波的散射
4.
An Analytical Solution for Scattering and Diffraction of Plane-SV-waves by a Cylindrical Lined Cavity in Half-space of Saturated Soil
饱和土半空间中地下圆形衬砌洞室对平面SV波的散射
5.
Study on Concrete Lining Corrosion Reason and Protection of the Tunnel;
隧洞混凝土衬砌腐蚀成因及防护研究
6.
Construction Technology of the Invert Lining and Scratch Mold for Jinping Diversion Tunnel
锦屏引水隧洞底拱衬砌刮模施工技术
7.
Fissure control technology of the concrete lining of Kessem tunnel
KESSEM隧洞混凝土衬砌裂缝控制技术
8.
A Study on Some Problems in the Calculation of Pressure Tunnel Lining
有压隧洞衬砌计算中几个问题的探讨
9.
Researches on the Condition of Cavitation of Unlined Diversion Type Pressure Tunnel and the Stability of Surrounding Rock;
不衬砌有压引水隧洞成洞条件及围岩稳定研究
10.
Study on the Two-dimensional Scattering of Plane-P-waves and Plane-SV-waves by Underground Cylindrical Lined Cavity in a Fluid-saturated Porous Media Half Space.;
饱和土半空间中圆形衬砌洞室对入射平面P波和平面SV波散射的研究
11.
The access tunnel of Yangshan three-stage hydro-power plant is lined around the tunnel at bends and reaches of rock rupture but is nonlined at other reaches.
仰山三级电站引水隧洞为不衬砌隧洞,只在弯道段和岩体破碎段进行了全断面衬砌。
12.
Construction guide for prestressed tendon of hydraulic tunnel with concrete lining
水工隧洞预应力混凝土衬砌锚束施工导则
13.
Crack-Proof Technique by Temperature Control of Tunnel Concrete Lining in Construction Period;
隧洞混凝土衬砌施工期温控及防裂技术
14.
Computation and Analysis of Reinforced Concrete Lining of Tunnel in Rock;
岩石引水隧洞钢筋混凝土衬砌计算分析
15.
On Scattering & Diffraction of Underground, Circular, Lined Tunnels Subjected to Incident Cylindrical SH Waves;
地下圆形衬砌隧洞对柱面SH波的散射解析解
16.
Study on Crack-proof by Temperature Control of Lining Concrete of Hydraulic Tunnel in Construction Period;
水工隧洞衬砌混凝土施工期温控防裂研究
17.
Stability Analysys on Wall Rock and Nonlinearity Performance Study on Lined Tunnel;
隧洞围岩稳定性分析及衬砌的非线性研究
18.
Scattering of Cylindrical SH Waves by Underground Circular Inclusion and Lined Tunnels;
地下圆形夹塞区及衬砌隧洞对柱面SH波的散射