说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 句库 -> 充水试验
1.
Observed data analysis of water filling test of the high-pressure tunnel in Tianhuangping Pumped-Storage Power Station
天荒坪抽水蓄能电站高压隧洞充水试验实测资料分析
2.
Specification for rock test of water resources and hydropower development(supplement port)
水利水电工程岩石试验规程(补充部分)
3.
Experimental Research on the Characteristics of Moisture Infiltration into Soils under Non-sufficient Water Supply;
非充分供水土壤水分入渗特性的试验研究
4.
Experimental Study on Soil Infiltration Model in Non-sufficient Water Supplied
非充分供水土壤水分入渗模型的试验研究
5.
Test of Surrounding Concrete of Steel Spiral Case Keeping Constant Internal Water Pressure in Pubugou Hydropower Station
瀑布沟水电站充水保压蜗壳结构模型试验
6.
Study on the mechanism of packed bed electrodialysis and treatment of low-level waste water
填充床电渗析机理研究及处理低放废水试验
7.
Experimental Study on Factors Influencing the Effect of Falling Water Aeration (Providing Oxygen);
跌水曝气(充氧)效果的影响因素试验研究
8.
The Test Research on Soil Landslide s Stability Influenced by Crack Water;
裂缝充水对土质滑坡稳定性影响的试验研究
9.
TEST STUDY ON SLOWLY DECARBONIZING LIME TREATMENT OF MAKE-UP WATER AND BY-PASSING FLOW FOR THE CIRCULATIING WATER
循环水补充水与循环水旁流慢速脱碳石灰处理试验研究
10.
The Experimental Research on the Maximum Allowable Fullness Ratio (α) of UPVC Plastic Drainage Stack;
UPVC塑料排水立管最大允许充水率α值的试验研究
11.
Experiment of Deficit Irrigation of Forage Crop and Study on Crop-Water Model and Optimizing Decision for Water Management;
饲草料作物非充分灌溉试验和作物水-模型及水管理优化决策研究
12.
sand-packed tube displacement
砂粒填充管驱替试验
13.
EXPERIMENT ON HIGH-WATER QUICK CONSOLIDATED FILLING WITH SINGLE PIPING UNCLASSIFIED TAILINGS IN FENGHUANGSHAN COPPER MINE
单管输送全尾砂高水速凝胶结充填在凤凰山铜矿的试验
14.
High Moisture Quick Setting Ash Material for Mine Roadway backfill
高水灰渣速凝材料巷旁充填沿空留巷的试验研究
15.
Unite Mining Test and Application of Shallow Hole Shrinkage Stoping Method and Up Level Slicing Filling
浅眼留矿与向上水平分层充填法联合开采试验与应用
16.
Prediction and experiment for α wave equilibrium sand bed height in horizontal well gravel-packing based on equilibrium velocity
基于平衡流速的水平井砾石充填α波砂床平衡高度预测与试验
17.
Charge and discharge operation test for battery and charge equipment.
蓄电池和充电装置的充放电试验。
18.
pilot waterflood
试验区注水驱油试验