说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 句库 -> 沉井施工方案
1.
On pile cap open caisson construction scheme of super-large bridge of Zhongying expressway Yellow River in Ningxia
宁夏中营高速黄河特大桥承台沉井施工方案
2.
open caisson method in underground construction
地下工程沉井法施工
3.
The Construction Program of Exposing Deep Seam of in Main Shaft Coal of HU Jia-River Mine
胡家河煤矿主井井筒揭露深厚煤层施工方案
4.
Scheme Analysis of Reconstructing Underground Water Channel Working Shaft into Water Collecting Well
引水隧道施工井改造为集水井方案分析
5.
Research on Construction Method of Bridge Caisson Foundation under Special Geologic Condition;
特殊地质条件下桥梁沉井基础施工方法的研究
6.
About 2 Light Jet Level Wellbead Precipitations the Design of the Programme of Construction;
关于轻型射流二级井点降水施工方案的设计
7.
Plan design of portal excavation with semi-open and semi-underground method and the construction of Longjing tunnel
龙井隧道半明半暗进洞方案设计与施工
8.
Construction Scheme Selection for No.4 Inclined Shaft of Xiangshan Tunnel on Longyan-Xiamen Railway
龙厦铁路象山隧道4~#斜井施工方案比选
9.
Elementary Discussion on Deep Well Dewatering in Construction of Open Caisson by "Drainage Sinking Method"
浅谈“排水下沉法”沉井施工中的深井降水
10.
The Approaches for the Construction of Super Large Open Caisson Foundation of the North Anchorage on the Yangtze River Highway Bridge at Jiangyin
江阴长江公路大桥北锚碇基础特大沉井施工方法
11.
Technique Measures in the Construction of Open Caisson for the Dalian Xinghai No.1 Bridge;
大连市星海1号桥锚碇沉井施工技术
12.
Application of the Technique of Immersed Well Construction to the Deep Foundation of the Beach;
沉井施工技术在海滩深基础中的应用
13.
Application of Hydraulic Suction Method in Larger Open Caisson Construction
水力冲吸法在较大沉井施工中的应用
14.
Main Points on the Construction of Circulating Pump Room in Large Thermal Power Plant
大型火力发电厂循泵房沉井施工要点
15.
Study on Influence of Drainage for Open Caisson's Construction on Levee Security of Yangtse River
沉井施工降水对江堤安全影响的研究
16.
Foundation of T-type Open Caisson and Design of Sinking Stability Construction
T形沉井的基础及下沉稳定性施工设计
17.
Resistance Monitoring in Construction of Caisson Foundation of Cofferdam of Xiangjiaba Hydropower Station
向家坝水电站围堰基础沉井施工下沉阻力监测
18.
Countermeasure to Overcome Sinking when Construction of Open Caisson in Upper-soft and Lower-hard Soil Horizon
上软下硬土层中沉井施工时克服阻沉的对策