1.
Technical innovations of Gezhouba Group in construction of hydropower engineering
葛洲坝集团在水电施工中的技术创新
2.
Speeding up development making steady advancement building a harmonic "grand wealthy" Gezhouba group;
加快发展 稳步推进 建设和谐的“大强富”葛洲坝集团
3.
The Research of the Relationship between Organizational Commitment and Corporate Culture in China Gezhouba (Group) Corporation
中国葛洲坝集团公司组织承诺与企业文化关系研究
4.
The Main Reason and the Countermeasure Toward the Leaching of the Talented Person--First Explore of the Social Function System & Human Resource Management of Gezhouba Corp;
人才流失的主要原因及对策——葛洲坝集团社会职能系统人力资源管理初探
5.
China Gezhouba Construction Group Corp.
中国葛洲坝水利水电工程集团公司
6.
Study on Multi-industry Development Strategy for Gezhouba Hydroelectric Power Plant;
葛洲坝电厂多种经营产业集团化发展战略
7.
Status and Progress of Operation Techniques Integration on Cascade Project of Three Gorges and Gezhouba
三峡-葛洲坝梯级水利枢纽调度技术集成研究的现状与展望
8.
Both Gezhouba Project and Three-gorges dam are built in Yichang.
葛洲坝工程和三峡大坝都处在宜昌。
9.
Experimental Studies of Sediment Problems of Gezhouba Project on the Changjiang River
长江葛洲坝工程泥沙问题的试验研究
10.
Gezhouba dam is one of the largest sluice gates on a inside river in the world.
葛洲坝是世界上最大的内河船闸之一。
11.
Measurement and Analysis of Harmonic Wave about Gezhouba 500kV DC Converter Station;
葛洲坝500kV直流换流站谐波测试与分析
12.
Methodology Study and Practices of Optimal Maintenance for Gezhouba Hydro Power Plant;
葛洲坝电厂最优维护方法研究与实践
13.
Effects of Three Gorges and Gezhouba reservoirs on river water temperature regimes
三峡-葛洲坝梯级水库水温影响研究
14.
Joint Dispatch of Three Gorges-Gezhouba Cascade Reservoirs
三峡—葛洲坝梯级枢纽联合调度运用
15.
Realization of Primary Frequency Regulation for Generator Units in Gezhouba Hydropower Plant
葛洲坝电厂机组一次调频功能的实现
16.
Twice careful decision-making by Premier Zhou on Gezhouba Project
周恩来对葛洲坝工程的两次慎重决策
17.
Analysis of Energy Loss and Economic Operation for Main Transformer in Gezhouba Power Plant
葛洲坝电厂主变变损和经济运行分析
18.
A Study on the Resistance Against Abrasion for the Sluice Buildings of Gezhouba Project
葛洲坝工程泄水建筑物抗冲耐磨试验研究