1.
Discussion on Accident Causing Shutdown of TBM in Excavation of Tunnel of Northern Main Line
引黄北干线某隧洞TBM卡机事故探讨
2.
On Planning of Regulation Reservoirs in North Main Line of YRDP
万家寨引黄北干线调节水库规划问题
3.
Research on the Loess Collapsibility Project Geology of Water Conveyance Line in the North Trunk of Yellow River Diversion Project
引黄北干输水线路黄土湿陷性工程地质研究
4.
Water Price Design of the North Arterial Project of Yellow River Diversion in Wanjiazai;
对万家寨引黄北干线工程水价设计的思考
5.
The Application of Geosynthetics in the Storage Reservoir of Yellow River Diversion Project
土工合成材料在引黄北干调节水库中的应用
6.
Analysis on the Seepage Deformation of the Dam Foundation of Shangxizhuang Reservoir in North Trunk of YRDP(Yellow River Diversion Project)
引黄北干尚希庄水库坝基渗透变形分析
7.
Water Quality Modeling and Control Study of Sang Gan River in the North Line of the Yellow River Diversion Project
引黄北干线输水工程桑干河道水质模拟与控制研究
8.
Analysis on Unstable Factors of NO.1 Tunnel’s section Excavated by Drill-blast Tunneling Method in North Main Line of YRDP and Corresponding Countermeasure
万家寨引黄北干1号隧洞钻爆法施工洞段不稳定性因素分析及对策
9.
Effects Analysis of Diverting Water and Sand of Warping Tests in Xiaobeiganliu of the Yellow River;
黄河小北干流放淤试验引水引沙效果分析
10.
Analysis on Constructing PCCP Factory in North Main Line Project of Wanjiazhai YRDP;
万家寨引黄工程北干线PCCP管厂的建设分析
11.
Evaluation of Reservoir Seepage for the Daliang Yellow River Diversion Project;
引黄入晋工程北干线大梁水库渗漏问题研究
12.
Environmental Protection Design of Wanjiazhai Yellow River Diversion Project(North Main)
万家寨引黄入晋工程北干线环境保护设计
13.
On the Structure Calculation of Buried Culvert of Datong Section,Northern Route of Shanxi Wanjiazhai YRDP
山西省万家寨引黄工程北干线大同段埋涵结构计算
14.
Scheme Comparison of Transfer and Storage Reservoir in the North Trunk of Diversion Yellow River Water into Shanxi Project in Wanjia Village Shanxi Province
山西省万家寨引黄入晋工程北干线调蓄水库方案比选
15.
Discussion on the Influences of the Construction of No.1 Tunnel of Northern Trunk in Wanzhanjiazhai YRDP on the Wells in Some Villages along the Line
万家寨引黄工程北干线1号隧洞施工对沿线部分村庄水井的影响
16.
KATST LEAKAGE PROBLEM IN WATER CONSERVANCY AND HYDROELECTRIC POWER PROJECT IN THE NORTH OF THE NORTH MAIN RIVER OF THE YELLOW RIVER
黄河北干流北部水利水电工程的岩溶渗漏问题
17.
Study of BeiyinQushou Sluice Scheme Optimization in Northern Nenjiang Water Transfer Key Project
引嫩骨干工程北引渠首泄洪闸方案优选研究
18.
European medic naturalized in North America having yellow flowers and sickle-shaped pods.
引入北美的欧洲苜蓿,开黄花,结镰刀形荚。