说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 句库 -> 猴子岩水电站
1.
Study on stability of the tunnel-face slope at Houziyan Hydropower Station
猴子岩水电站进水口洞脸边坡稳定性分析
2.
Study on Stability Slope of Water and Electricity Reservoir on the Monkey Cliff Dadu River;
大渡河猴子岩水电库区斜坡稳定性研究
3.
Type Selection & Anti-abrasion Treatments for Turbine of Houchang Hydropower Station
猴场水电站水轮机选型及抗磨蚀措施
4.
Study on the Engineering Geological Property of the Rock-mass and Soil-body in the Dam Site of Nazi Gorge Hydropower Station
纳子峡水电站坝区岩土体工程地质性质研究
5.
Classification and Mechanical Properties of Surrounding Rocks at Expansion Project of Yantan Hydropower Station
岩滩水电站扩建工程围岩分级及其力学特性
6.
Weathering Characteristics of E'mei Mountain Basalts in a Certain Hydropower Project,Southwester Area
某水电站坝区峨眉山玄武岩岩体风化特征
7.
Treatment Research on Dr2 Endangered Rock Mass of Suofengying Hydropower Station;
索风营水电站Dr2危岩体处理措施研究
8.
Construction Techniques of Rockbolting Beam in Underground Powerhouse at Baoxing Hydropower Station
宝兴水电站地下厂房岩锚梁施工技术
9.
Innovational spirit in construction of Geheyan Hydropower Station
隔河岩水电站工程建设中的创新精神
10.
Anisotropic Properties of Sandstone and Slate at Lianghekou Hydropower Station
两河口水电站砂、板岩各向异性的研究
11.
An Analysis of Surrounding Rock Stability of Diversion and the Generating Tunnel of the Jiangpinghe Power Station
江坪河水电站引水发电洞围岩稳定性分析
12.
Studies on Deformation Measurement for Surrounding Rock of Headrace Tunnels in a Certain Hydropower Project
某水电站引水隧洞群的围岩变形量测研究
13.
Rock Classification of Diversion Tunnel Study of Jinping Ⅱ Hydropower Station in Yalong River
雅砻江锦屏二级水电站引水隧洞围岩分类研究
14.
Numerical simulation of rockburst on the drain tunnel in the Jinping Second Level Hydropower Station
锦屏二级水电站施工排水洞岩爆数值模拟
15.
Rockmass plastic deformation treatment for diversion tunnel of Budong HPP
布东水电站引水隧洞岩体塑性变形的处理
16.
Research on the Karst Growth Characteristics and Karst Water System in Dam Area of QiZong Hydropowerstation
其宗水电站坝址区岩溶发育特征及岩溶水系统研究
17.
Study on Linear Programming Simulation of Water-rock Reaction of Basalt at the Dam Area of Baihetan Hydropower Station
白鹤滩水电站坝址区玄武岩水—岩作用线性规划模拟研究
18.
Imitation of water-rock reactions of basalt and its application in the dam site area of Baihetan hydropower station
白鹤滩水电站坝址区玄武岩水—岩作用模拟及应用研究