1.
Construction quality "flow leading" accountant accomplishment educational pattern
构建高职“流程主导型”会计素养教育模式
2.
dominant course (suggestive of running water) of successive events or ideas.
连续事件或思想的主导过程(使人联想到流水)。
3.
A Method to Accelevate the Closing Process of The Main Valve Opening of Pilot Relief Valve;
加快先导式溢流阀主阀口关闭过程的方法
4.
According to Guo, the height of the dam on the left bank of the Three Gorges will reach 185 meters this year, and the damming of the diversion channel will be completed in November.
郭主任介绍说,三峡左岸大坝今年达185米高程,10月导流明渠截流。
5.
The construction of key projects progressed smoothly, including the successful damming of the headrace and the completion of the principal part of the main dam on the left side of the Three Gorges Project; ;
重点工程建设进展顺利。 长江三峡工程导流明渠截流成功,左岸大坝主体工程基本完成;
6.
The construction of key projects progressed smoothly, including the successful damming of the headrace and the completion of the principal part of the main dam on the left side of the Three Gorges Project;;
重点工程建设进展顺利。长江三峡工程导流明渠截流成功,左岸大坝主体工程基本完成;
7.
Dicussion on "subject,dominance,and mainstream" of the construction of the corporation of the university;
论高校社团建设的主体、主导和主流
8.
Diversion Work Design and Analysis on Investment Ratio between Diversion Work and Main Work of Shaqian Hydropower Station on the Furong River in Guizhou
贵州芙蓉江沙阡水电站导流工程设计及其与主体工程投资比例分析
9.
Guide for design of construction diversion for hydropower and water conservancy project
水电水利工程施工导流设计导则
10.
Distance Education, the Principle Part and the Self-control Study;
远程教育、主体性与自主学习引导例说
11.
Who Lead the Marketing Channel, the Manufacturer or the Distributor?;
生产商主导 还是流通商主导——关于流通渠道控制的产业组织分析
12.
Many products comprise elements belonging to different generic product categories. Whether the product is then called service, software, hardware or processed material depends on the dominant element.
许多产品由不同类别的产品构成,服务、软件、硬件或流程性材料的区分取决于其主导成分。
13.
The main process parameters include hydrogen content in the gas sources, hydrogen plasma catalyst pretreatment, substrate bias, deposition temperature and plasma flow guiding.
主要之制程参数包括气源中之氢气含量、电浆前处理、材偏压、积温度以及电浆导流板之施加。
14.
The application of the New Austrian Tunneling Method to the tunneling of the diversion tunnel for Dalong Water Control Project is described herein.
主要介绍新奥法施工在三亚大隆水利枢纽工程导流隧洞开挖中的应用。
15.
On Government s Creation of Mainstream Economy;
政府应该创造主流化经济———由罗斯福新政中建立麻梭浅滩水电工程的效果推导
16.
They cover iss ues that receive little attention by mainstream media.
他们报导不受主流媒体关注的议题。
17.
The Study on E-Marketplace Dominated by 3PL;
第三方物流主导的电子交易市场研究
18.
Integration of China s Logistics Industry Subject to SCP Method;
SCP范式主导下的我国物流产业整合