1.
The methods and effect of quality control of unqualified items based on ISO9000 Quality Management System;
对ISO9000质量管理体系中不合格项目的质量控制方法与效果
2.
The Breakdown price for the Contract Plant
合同项目的分项价格如下
3.
The project file format cannot be read. The project will not be opened.
项目文件格式无法读取。 该项目将不被打开。
4.
economically unsound project
经济上不合算的项目
5.
Cannot retrieve channel format, bad item index.
不能获取通道格式,无效项目索引。
6.
Error loading project file '%1' - Not in the correct format.
加载项目文件“%1”时出错-格式不正确。
7.
Illegal and unjustifiable funds and charges.
不合法、不合理基金和收费项目。
8.
Joint European Project
欧洲联合项目(联合项目)
9.
{Consolidated projects and template files cannot be used as inserted projects.}Choose another project, and then try again.
{合并项目和模板文件不能用做插入项目。}请选择其他项目,再试一次。
10.
The itemized price list of the Contract Plant in Appendix 7.
本合同项目的详细价格清单详见本合同附件七。
11.
He' s unqualified -- we can' t give him this job.
他不合格――我们不能让他干这项工作。
12.
There are many ways to determine the causes of nonconformity, including analysis by an individual or the assignment of a corrective-action project team.
确定不合格原因的方法有许多,包括由个人或委托纠正措施项目小组所做的分析。
13.
Government departments at all levels should strictly control the launching of ordinary projects in the processing industry,and solve such problems as forming"large and all-inclusive"or"small and all-inclusive"establishments and launching irrational and duplicated construction projects.
各级政府部门应严格控制一般加工工业项目,解决“大而全”、“小而全”和不合理的重复建设问题
14.
Does the software support Bar Code Scanning to ring up items?
软件支持条形码符合格律把项目记入收款机吗?
15.
Theory and Measure for Adjusting Contract Price of Hydropower Project;
水电建设项目合同价格调整的理论与方法研究
16.
Reasonably determining price for a couple of Bill items in bidding for Guangzhou metro;
广州地铁投标中几个清单项目价格的合理确定
17.
Discussion on the effect of greenhouse gas emission reduction and the qualification as CDM project for biogas technology;
沼气技术的减排效果与CDM项目合格性探讨
18.
The Application of the Lattice of Closed Item Sets Theory in the Periodical Market;
闭合项目集格空间理论在期刊销售中的应用