1.
Coal mine construction projects shall conform with the plans for coal production and development and the policies for the coal industry.
煤矿建设项目应当符合煤炭生产开发规划和煤炭产业政策。
2.
(1) having a feasibility study report on or mining plan for coal mine construction project;
(一)有煤矿建设项目可行性研究报告或者开采方案;
3.
The facilities for environmental protection of a coal mine construction project must be designed, constructed, checked and accepted, and put into use simultaneously with the main project.
煤矿建设项目的环境保护设施必须与主体工程同时设计、同时施工、同时验收、同时投入使用。
4.
Coal Mine Construction Project Investment Post-evaluation Research and Practice
煤矿投资建设项目后评价研究与实践
5.
The main environmental & social problems in China s large coal mine construction and the countermeasures;
我国大型煤矿项目建设环境、社会问题及其对策
6.
Feasibility Study of the Second Zhaogu Mine Project of Jiaomei Group
焦煤集团赵固二矿建设项目可行性研究
7.
Discussion on Feasibility of Matching Building of Coal-lan Project in Huangtaolegai Coal Mine
黄陶勒盖煤矿配套建设兰炭项目的可行性探讨
8.
Research about Progress Control for Mine Construction Project of Daxihu Coal of Jinha Company
晋哈公司大西湖煤矿矿建项目进度控制研究
9.
My View about Improvement of Financial Evaluation Quality of Newbuild Coal Mine Project;
提高新建煤矿项目财务评价质量之我见
10.
Project Design of Environmental Protection and Compositive Exploitation for Jiangzhuang Coal Mine Corporation Themoelectrical Power Station;
蒋庄煤矿矸石热电厂环保综合利用项目设计
11.
Strength management of IT project, promote informatization in Ningxia coal industry enterprise;
加强IT项目管理 推进宁煤信息化建设
12.
Inquiry on Better Procurement Administration for a Construction Project of Coal Preparation Plant;
搞好选煤厂建设项目采购管理的探讨
13.
Study on Tendering with Bill of Quantity in Mine Construction Projects;
矿山建设项目工程量清单招投标探讨
14.
Study on Construction Project Management Mode of Jibei Ining Area;
济(宁)北矿区建设项目管理模式研究
15.
Decision Support System for the Non-coal Industrial Project Evaluation in Coal Mine;
煤矿非煤产业项目评价决策支持系统
16.
The Study of REES~P System of Coal Construction Project of Based on Sustainable Development;
基于可持续发展的煤炭建设项目REES~P系统研究
17.
Study on Evaluation-target System for the Construction of Coal Fired Thermal Power Plant;
煤炭发电项目建设方案综合评价体系研究
18.
Project Quality Management Research of JiuTai Mining Coal Subsidence Area;
九台市采煤沉陷区建设工程项目质量管理研究