说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 句库 -> 围海造地工程
1.
Points of safety supervision for sea reclamation engineering
浅谈围海造地工程施工安全监理工作要点
2.
Study on the Risk Management of Reclamation Project;
风险管理在围海造地工程中的应用研究
3.
Assessing the Impact of Reclamation Activities on Recent Sedimentation in Victoria Harbour, Hong Kong
围海造地工程对香港维多利亚港现代沉积作用的影响
4.
The reclamation of land from the sea, or other projects to enclose sea areas, and the excavation of sand and gravel shall be strictly controlled.
对围海造地或其他围海工程,以及采挖砂石,应当严格控制。
5.
Study on the Method of Backfill in Coastal Reclamation Project of Tianjin Lingang Industrial Area;
天津临港产业区围海造陆工程吹填法研究
6.
A Processing Method of the Soft-soil Foundation in the Gain-land-from-the-sea project of a Power Plant in the Coastal Area of Fujian Province
福建沿海某发电厂围海工程软土地基处理方法
7.
Discussion on Tide-break & Flood-control Standards and Elevation Design for the Phase I Project of Reclaiming Fields from the Sea in Tianjin Lingang Industrial Park
天津临港工业区围海造陆一期工程防潮标准及高程设计探讨
8.
Maritime engineering design in the project of Offshore Oil Engineering (Qingdao) Co., Ltd.
中国海洋石油工程青岛海工建造基地工程设计及地基处理研究
9.
Research on the Design Scheme of Hydraulic Sandfill Engineering of LongXue Shipbuilding Base;
广州龙穴造船基地围堤吹填工程设计方案研究
10.
Monitoring and Test Technique in East Sea Area Ground Treatment of Xiamen
厦门环东海域填海造地工程监测与检测技术
11.
Study on the Problem of Evaluating the Flood-Control Influence of Engineering Project of Enclosing Sea Area to Make Land in the River Mouth of New Yongding River;
永定新河口围海造陆工程防洪影响评价问题的研究
12.
Foundation of Sea Reclamation Project in Beibu Gulf of Guananxi and the Construction Method
广西北部湾填海造陆工程地基基础及施工方法
13.
Design and construction of dock-gate cofferdam of Cosco Qidong marine base
中远船务启东海工基地坞口围堰工程的设计与施工
14.
The Effects of Reclamation and Sustainable Development on Coastal Zone in Shanghai;
上海市围海造地效应分析与海岸带可持续发展
15.
Research on the Utilization of Marine Spatial Resource of Macao--The Project of Reclaiming Land from the Sea;
澳门海洋空间资源利用研究——澳门的填海造地工程
16.
On stability of surrounding rock and its control in underground projects
浅谈地下工程围岩稳定性与围岩控制
17.
The engineers had to know the depth profile (轮廓,形状) of the route to estimate the length of cable that had to be manufactured.
工程师们需要了解沿线的海底地貌,以便估算需要制造多长的电缆。
18.
The Marine Engineering Geological Environment Characteristic and Its Quality Evaluation in the Kuihuadao Structure of Liaodong Bay Summary;
辽东湾葵花岛构造区海洋工程地质环境特征及其质量评价