说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 句库 -> 大直径盾构隧道
1.
Study on the Structural Model with Characteristics of Large Shield Tunnel;
考虑大直径盾构隧道结构特点的计算方法研究
2.
Study on Seismic Responses and Vibration-Absorption Measures for Large-Diameter Shield Tunnel
大直径盾构隧道结构地震响应及减震措施研究
3.
Deformation Analysis of an Existing Subway Station Structure Traversed Down by a Large Shield Tunnel
大直径盾构隧道下穿既有车站诱发车站结构变形分析
4.
Prevention on Shield Leakage for Shield Machine with Large Diameter in Long Distance Cross-river Tunnel Construction
大直径长距离过江隧道盾构机盾尾泄漏的防治
5.
Energy-saving and environmental-protection technique of shield slurry-handling system in large-diameter tunnel project
大直径隧道盾构泥水处理系统的节能环保技术
6.
Research on Segment Structure of under River Shield Tunnel with Large Diameter and Its Engineering Application;
大直径越江盾构隧道管片结构理论分析及其工程应用研究
7.
The Tunneling Technology of Minor Radius Curve Metro Tunnel Shield Method
小半径曲线地铁隧道盾构法掘进技术
8.
Axis Control of Shield Driving in Small Curvature Radius of Tunnel
小曲率半径隧道盾构推进的轴线控制
9.
Study on Relaxation Effect of Vertical Soil Pressure for Shield Tunnel;
盾构隧道垂直土压力松动效应的研究
10.
Analysis of radius and depth of shield tunnel on its seismic response
盾构隧道半径及埋深对其地震响应的影响分析
11.
Behind the cutting edge is the tail, which has a smaller diameter. The permanent lining of the tunnel is assembled in this area.
切削口的后面是直径较小的盾构尾部,隧道的永久性衬砌就在此处进行。
12.
Application of vertically freezing reinforcement in recovery work of a shield tunnel
盾构隧道修复工程中的垂直冻结加固应用
13.
On Strengthening Technology of Liquified Nitrogen Vertical Freezing for the Shield Tunnel Opening in the Metro Tunnel
地铁隧道盾构出洞口液氮竖直冻结加固技术
14.
Research on the Calculation Method for Vertical Earth Pressure of Shield Tunnel in Soil Layer
土质地层中盾构隧道垂直荷载计算方法探讨
15.
Study on Reinforcement of Segment Lining Structure for Large-scale Underwater Shield Tunnel
大型水下盾构隧道管片衬砌结构配筋问题研究
16.
Launching Technology of Super-diameter Slurry-pressure-balance TBM
超大直径泥水平衡式盾构机始发技术
17.
DYNAMIC RESPONSE AND FATIGUE LIFE TO THE LININGS OF EXCEPTIONAL SIZE SHIELD TUNNEL
超大盾构隧道动力响应及疲劳寿命分析
18.
Determination of Excavation Moment of Parallel Large Diameter Tunnel and Cross Passage
大直径平行隧道及联络通道施工时机的确定