1.
Location Determination of Underground River below Tianziling Tunnel of Wuhan-Guangzhou Passenger Special Line
武广客运专线天子岭隧道地下暗河位置的确定
2.
Tunnel Landslide Disposal--Taking Qinlingguan Tunnel as an Example
隧道塌方处理实例——以秦岭关隧道为例
3.
The Application of Steel-fiber Concrete Singe-layer Lining with Wetspraying Method on the Motianling Tunnel Slope 1# Engineering
钢纤维湿喷混凝土单层衬砌在摩天岭隧道1#斜井工程中的应用
4.
Comparison and Selection of a Mountainous Tunnel in the Middle Tianshan Mountain No.2 Line of Southern Xinjiang Railway and Its Engineering Geological Condition Analysis
南疆铁路二线中天山越岭隧道比选及其工程地质条件分析
5.
Study on In-Situ Stresses Measurement with Hydro-Fracturing Method & Stability of Tunnel Project in the Site of Deep-Buried and the Longer Tunnel in the Northern of TANSHAN on JIYIHUO Railways, Sinkiang;
新疆精伊霍铁路北天山越岭深埋特长隧道区水压致裂地应力测量与隧道工程稳定性研究
6.
Application of D-type Temporary Beam Reinforcement in Construction of Entrance Section of Yangziling Tunnel Crossing Underneath Existing Railway
D型便梁加固在羊子岭隧道进口段下穿既有铁路施工中的应用
7.
Study on the Construction Security Risk Identification of Highway Mountain Tunnel;
公路山岭隧道施工安全风险辨识研究
8.
Regulation and Prevention and Cure Methods to Groundwater in Mountain Tunnel;
山岭隧道地下水规律及防治方法研究
9.
Construction in Slip-form of Shaft No.2 in the Qinling Zhongnanshan Highway Tunnel
秦岭终南山公路隧道2#竖井滑模施工
10.
Tunneling Scheme for Bias Pressure Section of Right Line Tunnel Exist
桃墅岭隧道右线出口偏压段进洞方案
11.
A Study on Wushaoling Tunnel's Auxiliary Gallery Influence on Operation Ventilation and Long Tunnel Rescue Station Disaster Prevention Research
乌鞘岭隧道辅助坑道对运营通风的影响及特长隧道定点防灾研究
12.
Construction techniques of elastically bearing block solid bed for Wuxiaoling tunnel;
乌鞘岭隧道弹性支承块式整体道床施工技术
13.
Some Key Matters regarding Mountainous Tunnel Design of Long-distance Pipeline
长输管道穿越山岭隧道设计的有关问题
14.
Study on 3D Deformation Rule of Tunnel and the Application of the Rule to Wushaoling Tunnel;
隧道三维变形规律研究及其在乌鞘岭隧道工程中的应用
15.
Experimental Study on Temperature Field Distribution of the Fire in Qinling King-size Highway Tunnel
秦岭特长公路隧道火灾温度场分布试验研究
16.
Construction Techniques and Quality Control in Application of New Austrian Tunneling Method (NATM) in Hefengling Tunnel
河丰岭隧道应用新奥法的施工工艺及质量控制
17.
MODEL OF A COMPLETE SET OF MACHINERY DURING RAPID CONSTRUCTION OF PARALLEL GUIDING ADIT AT EAST QINLING TUNNEL
东秦岭隧道平导快速施工机械设备配套模式
18.
Study on Earthquake Responses and Vibration-absorption Measures for Mountain Tunnel;
山岭隧道地震动力响应及减震措施研究