1.
The initialization of tropical cyclones in the NMC global model Part Ⅰ:Scheme design
全球数值模式中的台风初始化Ⅰ:方案设计
2.
The initialization of tropical cyclones in the NMC global model Part Ⅱ:Implementation.
全球数值模式中的台风初始化Ⅱ:业务应用
3.
Research on dynamic initialization of the asymmetric typhoon wind field
非对称台风风场的动力初始化应用研究
4.
The perpendicular shear of initial wind field is disadvantageous to the development of typhoon.
初始风场的垂直切变不利于台风的发展。
5.
Winsock is uninitialized
未初始化 Winsock
6.
Preliminary Study on Change of Humidity Field for Typhoons during Landfalling;
台风登陆前后湿度场变化的初步研究
7.
Performs arbitrary initialization before the workbench starts running.
在工作台启动之前,执行任意的初始化内容。
8.
The typhoon began to subside.
台风开始平息下来。
9.
Preliminary Study on Variations of Landfalling Tropical Cyclone Rainfall over East China
华东地区登陆台风降水变化的初步研究
10.
Windows Initialization Files
Windows初始化文件
11.
WINS initialization failed.
WINS 初始化失败。
12.
loop initialization
循环初置(初始状态的), 循环初始化
13.
Starting background file system checks in60 seconds.
这个档案用做后台档案系统检查,系统初始化的时候完成。
14.
Cannot initialize Message Queuing-based subscription because the platform is not Message Queuing %s compliant
无法初始化基于消息队列的订阅,因为平台不兼容消息队列 %1!
15.
Splash window is often used to screen background initialization when making powerbuilder application.
PowerBuilder制作应用程序时,经常要做Splash窗口来屏蔽后台的初始化工作。
16.
Starti-ng background file system checks in 60 seconds.
这个文件用做后台文件系统检查,系统初始化的时候完成。
17.
Cannot initialize security descriptor initialized.
无法初始化已初始化的安全描述符。
18.
An improved initialization method of typhoon and its 4DVAR experiments
改进的台风初值化方案及四维变分同化的个例试验