1.
Heat-supply method for concrete batching system on right bank of Laxiwa Hydropower Station
拉西瓦水电站右岸拌和系统的供热方法
2.
Innovation and Quality Control of Left Bank Mixing and Cooling System of Xiaowan Hydropower Station
小湾水电站左岸拌和及制冷系统技术改造与质量控制
3.
Features of the Alarm Mechanism of Computer Supervisory System of Three Gorges Right Bank Power Station
三峡右岸电站监控系统报警机制特点
4.
Standardized commissioning test procedure for SCADA system in right bank of Three Gorges
三峡右岸水电站监控系统的标准化调试
5.
Man-machine interface design of computer monitoring system for Three Gorges
三峡右岸电站计算机监控系统人机界面设计
6.
Application of Redundancy Mode to the Left-bank Computer Monitoring System for the Three Gorges Project
冗余方式在三峡右岸计算机监控系统中的应用
7.
General design for monitoring system of TGP right bank power station and underground power station
三峡右岸及地下电站监控系统总体方案设计
8.
AN EXPERT SYSTEM FOR AGITATOR SELECTION--KNOWLEDGE DISPOSAL AND SYSTEM IMPLEMENTATION
搅拌器选型专家系统的知识处理和系统实现
9.
the agitation system design includes agitator design and agitation drive design.
搅拌系统设计包括搅拌器的结构设计和所需动力设计
10.
Research on Tailrace System of Tunnel with Sloping Ceiling in Right Bank Underground Hydropower Station;
金沙江向家坝水电站右岸地下电站变顶高尾水系统研究
11.
Interface Design and Optimization on Computer Monitoring System of Three Gorges Right Bank Power Station
三峡右岸电站计算机监控系统人机界面的设计与优化
12.
Design of cooling for concrete production system on right bank of Guanyinyan Hydropower Station
观音岩水电站右岸1042m高程混凝土生产系统制冷设计
13.
Dyeing barrel, adding material pump, churning device.
配备加料、搅拌、进水和加热系统的颜料桶。
14.
Design of Concrete-Mixing-Station Measure-control System Based on PLC and IPC;
基于PLC和工控机的混凝土搅拌站测控系统设计
15.
Development and Application of Discrete Element Simulation System for Mixing Materials;
材料拌和离散元模拟系统的开发与应用
16.
Improved Rotor-driven Hydraulic System Design of Stabilized Soil Mixer
稳定土拌和机转子驱动液压系统改进设计
17.
The concrete mixing system fore-cooling concrete design of Gaomozan engineering
高摩赞工程混凝土拌和系统预冷混凝土设计
18.
Design of data acquisition system in bitumen mix plant based on USB2.0
基于USB2.0接口的沥青拌和站数据采集系统设计