1.
On Quality Control of Key Procedures of Prefabricated Box Girder Construction
![点击朗读](/dictall/images/read.gif)
浅谈预制箱梁施工关键工序的质量控制
2.
The Construction Technique of Ensuring the Efficiency of Critical Process in the Prestressed Cast-in-place Box Girder
确保预应力现浇箱梁关键工序施工效率的施工技术
3.
Study on Comparing the Improved Critical Process Algorithm with the Critical Process Algorithm
改进的关键工序法与关键工序法比较研究
4.
Program Development and Research on Key Technologys of Long-span Skew Angle Incremental Launching Continuous Bridge;
大跨度斜连续梁桥顶推施工仿真计算程序设计与关键技术研究
5.
Key Procedures in Cast-rolling Cupronickel Condenser
![点击朗读](/dictall/images/read.gif)
白铜冷凝管铸轧工艺关键工序的研究
6.
Key construction technology of karst tunnel and its engineering application
![点击朗读](/dictall/images/read.gif)
岩溶隧道施工关键技术及其工程应用
7.
Research on Key Problems and Dynamic Simulation for Top-Down Construction Technique;
![点击朗读](/dictall/images/read.gif)
逆作法施工关键技术与施工动态模拟研究
8.
Investigation of Railway Signal Construction and Other Related Key Procedure Control
![点击朗读](/dictall/images/read.gif)
铁道信号施工及配合施工关键环节卡控的探讨
9.
Sensitivity Analysis on Non-critical Process in PERT Network
![点击朗读](/dictall/images/read.gif)
PERT网络中非关键工序的敏感性分析
10.
Quality Ensure for Key Manufacturing Process of CA6DL Diesel Engine Cylinder Block;
![点击朗读](/dictall/images/read.gif)
CA6DL柴油机机体机械加工关键工序质量保证
11.
Quality Control of Key Stages During Cold Roller Machining Procedure
![点击朗读](/dictall/images/read.gif)
冷轧辊生产中机加工环节的关键工序质量控制
12.
Key Technology Study on Forked Tunnel Design and Construction;
![点击朗读](/dictall/images/read.gif)
分岔式隧道设计施工的关键技术研究
13.
The Research of Key Problems in the Incremental Launching of Cable-stayed Bridge with Steel Box Girder;
钢箱梁斜拉桥顶推施工关键问题研究
14.
Cost Control:The Key to Construction Item Cost Management;
![点击朗读](/dictall/images/read.gif)
成本控制——施工项目成本管理的关键
15.
Study on Large-scale Channel Diversion and the Key Technologies of Construction Closure
![点击朗读](/dictall/images/read.gif)
大型导流明渠截流施工关键技术研究
16.
Study on Construction Technology of Palms-together Dagoba in Famen Temple
![点击朗读](/dictall/images/read.gif)
法门寺合十舍利塔施工关键技术研究
17.
Key technologies of earth pressure balance shield in Chengdu metro construction
![点击朗读](/dictall/images/read.gif)
成都地铁土压平衡盾构施工关键技术
18.
Key technology research on the rolling lean concrete base construction
![点击朗读](/dictall/images/read.gif)
碾压贫混凝土基层施工关键技术研究