说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 句库 -> 南水北调中线穿黄工程
1.
Study on the Alternative Route of the Yellow River-crossing Project
南水北调中线穿黄工程线路比选方案试验研究
2.
Technology of High Pressure with Water and Cement through a Single Rolling Tube for the Silo on North Bank of Yellow River in the Project of Yellow River Crossing Tunnel of South-to-North Water Diversion Middle Route
南水北调中线穿黄工程北岸竖井单管法高喷封底加固施工
3.
Aseismic Analysis of the Bended Pipe Built in the North Shore of the Through Yellow Rive Engineering of the Midline of South-to-North Water Diversion;
南水北调中线穿黄工程北岸竖井内弯管三维抗震分析
4.
Application of DNA03 digital levelling instrument in Yellow-River-Crossing works on mid route of South-to-North water transfer project
DNA03数字水准仪在南水北调中线穿黄工程中的应用
5.
Application of SMW construction method to foundation reinforcement during cutter-changing of shield machine under normal pressure in construction of Yellow River Crossing of South-to-North Water Transfer Project
SMW工法在南水北调中线穿黄工程盾构机常压换刀时地基加固中的应用
6.
Research on Key Technology in Yellow River Crossing Tunnel Construction of South-to-North Water Diversion Middle Route Project
南水北调中线工程穿黄隧洞关键技术研究
7.
Seepage Analysis on High Slope of Yellow River Tunnel Project in First-stage of Middle Route South-to-North Water Transfer Project
南水北调中线一期穿黄工程南岸渠道高边坡渗流分析
8.
Experimental research of water pumping for water supply in construction of tunnel passing through the Yellow River of the middle route works of S-N water diversion project
南水北调中线穿黄隧洞施工供水抽水试验研究
9.
The Grouting Experiment of Shield Tunnel Going Through Huanghe in Middle Line of South-to-North Water Diversion Project;
南水北调中线穿黄隧道工程盾构施工壁后注浆浆材研究
10.
The Application of the Machine-made Sand Concrete in the the Yellow River through Eastern South-to-north Water Diversion Project
机制砂混凝土在南水北调东线穿黄河工程中的应用
11.
Study on the Structure of the Project of Yellow River Crossing Tunnel of South-to-North Water Diversion East Route in Phase I
南水北调东线第一期工程穿黄隧洞结构分析研究
12.
Water Source Diversion Management in the Middle Route of the South-to-North Water Transfer Project
南水北调中线水源工程调水管理研究
13.
Clogging test of liner cushion layer in Yellow-River-crossing tunnel liner of South-to-North Water Transfer Project
南水北调工程穿黄隧洞衬砌垫层淤堵试验
14.
Study on Influences between River Flood and Structures Crossing Zhanghe River of the Middle Route of South-to-North Water Diversion Project in Phase-I
南水北调中线一期工程总干渠穿漳河建筑物洪水影响研究
15.
The Water Operation Research for Middle-Route of South-to-North Water Transfer Project;
南水北调中线工程水量调度仿真研究
16.
Study on the Problem of Timely Water Supply to the Yellow River Through the East Line Project Diverting Water from South to North;
南水北调东线工程相机向黄河补水研究
17.
The Optimization to Diversion Tunnel Route in Hebei Section of Mid-Rout in the South-to-North Water Transfer Project
南水北调中线工程河北段引水隧洞线路优化
18.
Flood Control in Beijing Section of the Middle Route of the South-to-North Water Transfer project
南水北调中线干线北京段工程防汛工作刍议