说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 句库 -> 下穿既有车站
1.
Deformation Analysis of an Existing Subway Station Structure Traversed Down by a Large Shield Tunnel
大直径盾构隧道下穿既有车站诱发车站结构变形分析
2.
Study on Undercrossing Existing Metro Station Construction Scheme of Beijing Metro Line 4 Xuanwumen Station
北京地铁四号线宣武门站下穿既有车站施工方案研究
3.
Numerical Simulation of Shield Tunnel Passing under the Existing Subway Station
盾构隧道近接下穿既有地铁车站的数值模拟
4.
Construction Control of a Newly-Built Subway Station Undercrossing the Existing Subway Tunnel
暗挖地铁车站下穿既有地铁隧道施工控制
5.
Mechanical Simulation and Analysis of Metro Station on the New Line Cross the Existing;
地铁新线车站穿越既有线车站的施工力学分析
6.
Research on the Effection and Deformation Control of Double-line Tunnel Undercrossing Existing Subway Station
双线暗涵近距离下穿既有地铁车站的影响及变形控制研究
7.
Remote monitoring system applied to the construction of metro station undercrossing existing metro tunnel
地铁车站下穿既有线隧道施工中的远程监测系统
8.
Safety Research on Lining Structures of Subway Station and the Existing Tunnel Underlying
地铁车站与下伏既有隧道的衬砌结构安全性研究
9.
On analysis of shield construction through existing subway in running tunnel
盾构施工下穿既有地铁区间隧道分析
10.
Investigation on Construction Technology and Security of Underpassing Metro Station Crossing Railway Ground;
地铁车站下穿铁路站场施工技术与安全性研究
11.
Research on Protection Schemes for Railway Station in Shield Construction
盾构隧道下穿火车站站场保护方案的探讨
12.
Research on the Simulation Model of High-Speed Trains' Private Yard under the Condition of Introducing the Passenger-Dedicated Line into Existing Station
客运专线引入既有客运站条件下高速车场作业系统仿真模型的研究
13.
Design and construction measures for a light-rail station to be built above an existing tunnel
既有隧道上方修建轻轨车站的设计与施工对策
14.
Study on Construction Technique of Metro Station Driven with Enlarging the Existing Shallow Air Defense Tunnels
浅埋既有人防隧道扩挖地铁车站施工技术研究
15.
On the Ground Surface Settlement and Existing Line Deformation Caused by the Shallow-burying and Undercutting Construction of Subway Station
浅埋暗挖地铁车站地表沉降及既有线变形分析
16.
The application of CFG pile in foundation treatment of signal building in existing station
CFG桩在既有车站信号楼地基处理中的应用
17.
Technical Study on Observational Method Applied to Shield Tunnel Undergonging Railway;
盾构隧道下穿既有铁路信息化施工技术研究
18.
Discussion on the construction craft of tunnel in passenger dedicated highway line underpasses through established railway pipe roof
客运专线隧道下穿既有铁路管幕施工技术