说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 句库 -> 后期坝
1.
In particular only a successive programme of injection of the vertical joints renders the work monolith in respect of the succeeding masses and stages
特别是,对后期坝体与以后施工阶段而言只有垂直接缝的分期灌桨程序,才能给与工程以整体性。
2.
A dam is necessary to be detected at regular intervals after a hydropower project begins to run.
大型水利枢纽开始运行以后,需要定期进行大坝安全性检测。
3.
Cause Analysis of Cracking in Dam Body during the Construction of Bailianya Dam
白莲崖大坝施工期坝体裂缝成因分析
4.
The Investigate of Measurement Method in Berm After Double-curvature Arch Dam of XiaoWan
小湾双曲拱坝坝后马道测量方法探讨
5.
Study on Assessment Model of Severity Degree of the Tailings Dam Failure Impact
尾矿坝溃坝后果严重度评价模型研究
6.
The Primary Study of Concrete Gravity Dam Type Comparison in First Stage of the Western Route Water-Transfer Project--Dam type comparison at Jike dam site
西线一期工程混凝土重力坝坝型比较初步研究——以纪柯坝址为例
7.
Data analysis on impervious wall under construction of Renzonghai hydropower station
仁宗海水库大坝坝基防渗墙在坝体填筑期间的监测资料分析
8.
Dam Body Filling Design by Stages for Concrete Face Rock-fill Dam of Hongjiadu Hydropower Station
洪家渡水电站面板堆石坝坝体填筑分期设计
9.
Dam reliability analysis during Periodic inspection on dam safety
大坝安全定期检查时的坝工可靠度分析
10.
Non-linear Finite Element Analysis for the Overflow CFRD in Construction Period
施工期坝面过水面板堆石坝非线性有限元分析
11.
Study on temperature-stress simulation of RCC dam during construction period
碾压混凝土坝施工期坝体温度及应力仿真研究
12.
The river was dammed up, and behind the dam a great deal of water presure was built up.
这条河筑起了水坝,水坝后面形成了很大的水压。
13.
The mouth of the river is dammed and a freshwater lake created behind the dam.
河口筑起了拦河坝,坝后便形成了淡水湖。
14.
Global Analysis of Static and Seismic Response for the Concrete Gravity Dam and Factory Building at Dam Toe;
混凝土重力坝及坝后式厂房整体静动力分析
15.
Analysis on Stress and Deformation of Jinping I High Arch Dam
坝基加固后锦屏一级高拱坝应力变形计算分析
16.
The Study of Dam Type Comparison Between Concrete Faced Rock-Filled Dam and Embankment Dam with an Asphaltic Concrete Core in first Stage of the Western Route Water-Transfer Project--Dam type comparison at Renda dam site
西线一期工程混凝土面板坝与沥青心墙坝坝型比较研究——以仁达坝址为例
17.
The Study of Dam Type Comparison Between Concrete Arch Dam and Concrete Faced Rock-Filled Dam in First Stage of the Western Route Water-Transfer Project--Dam type comparison at Reba dam site
西线一期工程混凝土拱坝与混凝土面板堆石坝坝型比较研究——以热巴坝址为例
18.
The Study of Dam Type Comparison between Concrete Faced Rock-Filled Dam and Embankment Dam with a Clay Core in First Stage of the Western Route Water-Transfer Project--Dam type comparison at Zhaluo dam site
西线一期工程混凝土面板坝与黏土心墙坝坝型比较研究——以扎洛坝址为例