1.
Design of wet chimney with double steel inner silo for 1000MW coal-fired power plant
1000MW级燃煤电厂双钢内筒湿烟囱设计
2.
Economic Analysis of Side Bunker Room of Huaneng Haimen 1000MW Ultra Supercritical Thermal Power Plant
华能海门电厂1000MW超超临界燃煤机组侧煤仓间布置经济性分析
3.
Disquisition on Burning Questions of Ultra-super Critical Coal-fired 1000MW Boiler of Yuhuan Power Plant
玉环电厂超超临界1000MW锅炉燃烧问题研究
4.
The Characteristics of Combustion in the Boiler of a Ningdian 1000MW Unit Phase Ⅱ
宁海电厂二期1000MW机组锅炉低负荷燃烧特性
5.
Application of 6 kV-40 kA Voltage on HV Auxiliary Power System for 1000 MW Units
1000MW级机组高压厂用电系统采用6kV-40kA一级电压的探讨
6.
Coal feeder is one of the most important equipments in a power factory.
给煤机是燃煤火力发电厂的重要设置。
7.
Design and Optimization of the Control System of Power Plant Coal Transported System
燃煤电厂输煤控制系统的设计与优化
8.
Research on the rate of sulfur in coal converted sulfur dioxide in pulverized boilers of coal-fired power plants
电厂煤粉炉燃煤中硫的转化规律研究
9.
Optimization Design of Auxiliry Power Wiring for 1000MW Units
1000MW火力发电厂厂用电优化设计
10.
Research on Electricity On-grid Pricing Mechanisms in China
我国燃煤电厂上网电价定价机制研究
11.
Research on the Coal-Fired Power Plant Desulfurization (Denitrogenation) Compensation Price Mechanism
燃煤电厂脱硫脱硝电价补偿机制研究
12.
energy supply for space heating is 2.70 million tce, taking 6.5% of the final energy consumption;
高井电厂改造燃气发电,削减燃煤量150万吨;
13.
A Study of Environmental Protection Problem of Coal-Fired Power Plant;
从南京下关电厂看燃煤电厂的环境保护问题
14.
Main source: coal-fired power plants and automobile exhaust.
主要来源:汽车尾气和燃煤发电厂。
15.
* Gaojing Power Plant is switched to gas-fired generation, reducing 1.50 million tons of coal;
高井电厂燃气改造,减煤150万吨。
16.
Ventilation and Dust Control of Main Room in Power Plant;
燃煤电站主厂房通风与粉尘污染控制
17.
Research on Intelligent Control of Coal Management System in Power Plant;
火电厂燃煤管理系统智能控制的研究
18.
Research on Mixed-coal Combustion Test in Luoding 135MW Power Plant
罗定电厂135MW机组混煤燃烧试验研究