1.
Sensitivity analysis of multi-area power system reliability based on component’s forced outage rate
基于元件强迫停运率的互联系统可靠性指标灵敏度分析
2.
The LOLP considers the forced outage of a generating unit.
LOLP考虑发电机组的强迫停运。
3.
Forcing a company to shutter its operations for a while is rare in the West.
在西方,强迫一家公司暂停运营是十分少见的。
4.
Generating capacity is taken out of service for scheduled maintenance or planned outage and is occasionally lost on an unplanned or forced outage.
发电容量的退出是为了计划维修或计划停电,或者偶然由于非计划或强迫停运。
5.
Component Outage Modeling Method for Operation Risk Assessment With Limited Power Components' Failure Data
运行风险评估中缺乏历史统计数据时的元件停运模型
6.
Analysis of a Time-varying Power Component Outage Model for Operation Risk Assessment
电力系统运行风险评估中元件时变停运模型分析
7.
This may be damped or undamped forced notion.
它可以是阻尼强迫运动或非阻尼强迫运动。
8.
Operating component failure rate analysis based on FTA for power system
基于FTA法的宁夏电网运行元件故障率分析
9.
An Outage Rate Model and System Adequacy Assessment Based on Adverse Weather Conditions
基于恶劣气候条件的停运率建模及电网充裕度评估
10.
Analysis and countermeasure of an accident of the main transformer forced outage
一起主变被迫停运事故的分析与对策
11.
The hot intensity of the heat insulation parts is analysed by the finite element method.
运用有限元法对隔热部件进行了热强度分析。
12.
Strengthen the management of electrical components and save the running fund for experimental circuits teaching
加强元器件管理 节约电路实验教学运行经费
13.
compel or force into a particular state or activity.
强迫或强制一件特殊的状态或行动。
14.
a peremptory writ
强制令状((强迫被告无条件出庭的传票))
15.
An official warrant for impressing men into military service.
强迫征兵令强制入伍的官方文件
16.
Improved the performance of conditional macros, slightly increasing the framerate.
增强了条件式宏命令的运行效率,略微提高了运行祯数。
17.
85 The lifting work on site will be compelled to stop, owing to the strong wind.(a dense fog ).
由于强风(浓雾),现场起重吊装工作将被迫停止。
18.
Directed Forgetting and Metamemory in High Obsessive-Compulsive Symptom Individuals;
高强迫症状个体的定向遗忘和元记忆