1.
The Applications ofmechanizedAncillary Equipment in Adit Construction
机械化配套装备在平硐施工中的应用
2.
Design and construction of two-door prevention water gate chamber with high pressure
高压双门硐防水闸门硐室设计与施工
3.
The Auxiliary System Optimization and Rapid Construction Organization of the Inclined Shaft into Tunnel with Different Modes of Transport
斜井转平硐不同运输方式下的辅助系统优化与快速施工组织
4.
Application of pumping concrete technology to construction of grouting adit for Tukahe Dam
泵送混凝土施工技术在土卡河大坝灌浆平硐中的应用
5.
Study of the Pilot Tunnel Drift Method Technology in Deeply Buried Large Cross Section Chambers of Composite Soft Rock
深埋复合型软岩大断面硐室导硐法施工及支护技术研究
6.
Research and Application of the Reconstruction Technology of Extra Large Size Chamber
浅谈特大型改扩建硐室施工技术的研究与应用
7.
Large-section room construction technique in weak strata in Jinchuan mine area
金川矿区软弱岩层大断面硐室施工技术
8.
Construction Technology of Extra-large Chamber with Super 100m~2 Net Section under Complex Condition
复杂条件下净断面超100m~2特大硐室施工技术
9.
Implemtation and Effect of Roadway Guide-Chamber High-Speed Driving Method at Coal Mines
煤巷导硐法快速掘进实施方法及效果
10.
To protect the adit pass and slope,the mass of engineering and technical personnel in Lanjian Iron Mine have explored the in-hole and between-holes microsecond blasting technology.
兰尖铁矿为保护平硐溜井和边坡,工程技术人员进行了孔内孔间微差爆破技术的探索。
11.
The Application of Combined Bolting and Shotcreting Technique in the Engineering of the Chamber with Large Cross Section
喷锚支护在大断面硐室工程中的应用
12.
Adit Sonic Wave Hole Seepage Test to Determine Rock Permeablity Coefficient
平硐声波孔渗水试验确定岩体渗透系数
13.
Technical Analysis of Adit-pass at Zijinshan Open Pit
紫金山金矿露天采场平硐溜井技术分析
14.
A Feasibility Study on Prolonging the Service Life of the 290 Level Adit in Nanfen Surface Mine
南芬露天矿延长290平硐服务年限的可行性研究
15.
The application of engineering geology to specific adit digging at deep shaft
工程地质在深井中特殊硐室开挖中的应用
16.
The Program Exploitation of Block Stability for Underground Caverns and Engineering Application;
地下硐室块体稳定性分析程序开发及工程应用
17.
Coyote blasting in application to Wawushan CFRD Project
硐室爆破在瓦屋山面板堆石坝工程中的应用
18.
"three connections and one leveling" assuring that a construction site is connected to water and electric power supplies and roads, and that the ground is leveled before a project is begun.
三通一平(水通、电通、路通、施工场地平)