说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 句库 -> 水下盾构隧道
1.
Study on Reinforcement of Segment Lining Structure for Large-scale Underwater Shield Tunnel
大型水下盾构隧道管片衬砌结构配筋问题研究
2.
Research on coupling seepage field and stress field analyses of underwater shield tunnel
水下盾构隧道渗流场应力场耦合效应研究
3.
Shield tunneling technology of Shiziyang subaqueous tunnel of Guangzhou-Shenzhen-Hongkong high-speed railway
广深港高速铁路狮子洋水下盾构隧道修建技术
4.
Plane Analysis of Seismic Response of the Underwater Saturated Sandy Subsoil with Shield Tunnel
水下盾构隧道饱和砂层地震响应的平面解析分析
5.
Key technologic problems on underwater shield tunnel
盾构法修建水下隧道的关键技术问题
6.
The Study of Numerical Simulation for the Interaction of Shield Tunnels Driven in Close Proximity under Water;
水下近距盾构隧道施工相互影响数值模拟研究
7.
Analysis on the Behavior of Existing Tunnels due to Setting of Slurry Pressure in Slurry Shield
下穿式盾构泥水压力对既有隧道的影响分析
8.
Waterproofing and sealing of shield tail and sealing grease
盾构法隧道的盾尾防水密封与盾尾密封油脂
9.
Initial Risk Control of Shiziyang Tunnel with Slurry Shield
狮子洋隧道泥水盾构始发的风险控制
10.
Slurry shield cutter wear analysis of Nanjing Yangtze River Tunnel
南京长江隧道泥水盾构刀具磨损分析
11.
Prevention and Control of Water and Sand Gushing at Shield Tail Seal during Shield Tunneling
盾构法隧道掘进中盾尾密封涌水涌砂防治技术
12.
Construction Techniques by Shield Tunneling Method in Upper-Soft Lower-Hard Ground
上软下硬地层中盾构法隧道施工技术
13.
On analysis of shield construction through existing subway in running tunnel
盾构施工下穿既有地铁区间隧道分析
14.
Risk Management for Subaqueous Shield Tunnels
论盾构法水下隧道工程的工程特点和风险管理方法
15.
Three-Dimensional Numerical Simulation Analysis of the Shield-Driven Tunnel Crossing under the Existing Structure
盾构法隧道下穿既有结构三维数值模拟分析
16.
Stability Analysis of Soil Body in Slurry Shield Tunneling and Test Research;
泥水盾构隧道施工土体稳定性分析与试验研究
17.
The Research for the Influence of Slurry Shield Passing Beneath the Existing Tunnel and the Construction Parameters
泥水盾构穿越既有隧道的影响及施工参数研究
18.
Analysis on the Law of Water and Earth Pressure by Shield Tunneling Construction
隧道盾构施工引起水土压力变化及其规律分析