1.
Application of Monitoring Technique to Yangtze River Tunnel Project of Anqing of Sichuan Gas to East China Pipe Engineering
川气东送管道安庆长江隧道穿越工程监测技术应用
2.
Construction Technology for Shanghai World Expo Electric Cable Tunnel Project Section I Undercrossing Metro Line No.2
上海世博会电力电缆隧道一标工程下穿越地铁2号线施工技术
3.
Research on the Numerical Simulation of the Construction Process of Changjiashan Tunnel Through the Coal Strata and Gob;
常家山隧道穿越煤系地层及采空区段的施工过程数值模拟研究
4.
Technique for Engineering Geological Survey of Tunnel Passing through Large Scale Filled Karst Cave
隧道穿越大型充填型溶洞的工程地质勘察技术研究
5.
Engineering Monitoring for Yangtzi River Tunnel Crossing Project of Anqing Gas Transmission Pipeline
川气东送管道安庆长江隧道穿越的施工监测
6.
The road round the lake goes through six tunnels .
环湖公路穿越六个隧道。
7.
Risk Control of the Construction of Xiamen Tunnel Through Regolith Sections;
厦门海底隧道穿越风化槽段施工的风险控制
8.
Research on Construction Technology of Tunnels in Soft Soil Passing Through Piled Objections;
软土隧道施工穿越桥梁桩基障碍物技术研究
9.
Study on Construction Technology of the Soft Rock Tunnel Passing Througy Existing Railway;
穿越既有铁路的软弱围岩双线隧道施工技术
10.
The Research for the Influence of Slurry Shield Passing Beneath the Existing Tunnel and the Construction Parameters
泥水盾构穿越既有隧道的影响及施工参数研究
11.
Underpinning Technology of Subway Tunnel Crossing Through Bridge Piles Foundation
地铁隧道穿越桥梁桩基的托换施工技术
12.
Construction Technique of Shield Tunnel beneath the Bridge Pile Foundation
盾构法隧道穿越在用桥梁桩基础施工技术
13.
Study on construction mechanical behavior of silt filled karst cave tunnel
隧道穿越淤泥质充填溶洞施工力学行为研究
14.
Safety risk management for construction of shield tunnel of Beijing subway undercrossing the South fourth ring road
北京地铁隧道穿越南四环路施工安全风险管理
15.
APPLICATION OF SLEEVE VALVE PIPE GROUTING IN CONSTRUCTION OF TUNNEL CROSSING BUILDING
袖阀管注浆在隧道穿越楼房施工中的应用
16.
Tunnel Through the Coal Seam Huangmaoba Construction Technology
黄茅坝隧道穿越煤层地段施工技术分析
17.
Construction Technology on Metro Shield Tunnel through Gas Stratum
地铁盾构隧道穿越瓦斯地层的施工技术
18.
Construction Technique of Xiamen Undersea Tunnel across F3 Weathered Trench
厦门海底隧道穿越F3风化深槽施工技术