1.
Estimation and Suggestion of Construction Ventilation Necessary System of Tie zhaizi No.1 Tunnel Entrance
铁寨子Ⅰ号隧道进口施工通风系统配套方案评估及建议
2.
Construction and Cost of Ⅰ-Type Slab Ballastless Track in Extra-long Tunnels on Shijiazhuang-Taiyuan Passenger-dedicated Railway
石太客运专线特长隧道Ⅰ型板式无砟轨道施工与造价
3.
Study on Fast Construction Technology for Moxi NO.2 Tunnel;
磨溪二号铁路隧道快速施工技术研究
4.
Construction method of the circle-shear type portal of the Senkeng second tunnel
森坑二号隧道圆切式洞门的施工方法
5.
External Rescue Engineering of No.109 Tunnel on Baoji-Chengdu Railway
宝成铁路109号隧道外围抢险工程
6.
Treatment of Dangerous Rock at Muchangzi 1# Tunnnel Portal
新木厂子一号隧道出口危岩整治设计
7.
The application of New Austrian Method in the construction of Dongshuiqian 1#, 2# tunnel
新奥法在东水泉1号和2号隧道施工中的应用
8.
Ventilation scheme of No.3 and No.4 inclined shaft entering straight tunnel of Lvliangshan tunnel
吕梁山隧道3号与4号斜井正洞通风方案
9.
Effect of Tunnel Thread-dragging Therapy on Collagen Type Ⅰ,Ⅲ Content in Rat with Fistula Wound Tissues
隧道式拖线法对瘘管大鼠Ⅰ型和Ⅲ型胶原表达的影响
10.
Study on Interaction Mechanism of Slope Adverse Geological Body and Tunnel at the Entrance of the Second Yaotou Tunnel
窑头2号隧道进口段斜坡不良地质体与隧道相互作用机理的研究
11.
Deformation Measuring of the Metro Tunnel and Deformation Data Analysis of Shanghai Metro Line No. 1
上海市地铁一号线隧道变形测量及规律分析
12.
Research on Huang Family Slope First Tunneling Project Time Optimization;
黄家坡一号隧道工程项目时间优化研究
13.
Study of Design and Construction Technique for Yang Ba Jing No.1 Tunnel on Qing Hai-Tibet Railway;
青藏铁路羊八井一号隧道设计与施工技术研究
14.
Research on Signal Processing Circuit of Micromachined Tunneling Accelerometer;
隧道式微加速度计信号处理电路的研究
15.
Preservation Study of Risk Evaluation in Xi'an Metro Line 1 Section Tunnel Construction
西安地铁1号线区间隧道施工风险评估初探
16.
Research on Support Technology for Dan Shan Gou 2# Double Arch Tunnel
丹山沟二号连拱隧道支护技术优化研究
17.
Construction Technology of Slip-formwork in No.2 Tunnel Shaft of Qinling Zhongnanshan Highway
秦岭终南山公路隧道2号竖井滑模施工技术
18.
CFD Simulation on Tunnel Fire Smoke Control in Beijing Metro the 4th Line
北京地铁4号线隧道火灾烟气控制的CFD模拟