说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 句库 -> 国投新登煤矿
1.
Measures and Practices of Energy-saving and Emission Reduction during Coal Production in Guotouxindeng Mine
国投新登煤矿生产过程中的节能减排措施与实践
2.
The new mines. Cannel.
投到开新矿、挖烛煤上头。
3.
The Efficiency of Input-output of Coal Mining Cities from Its Coal Mining Employee--Based on DEA Empirical Analysis;
我国煤矿人员对煤矿城市投入产出效率的影响——基于DEA的实证研究
4.
Discussion on How to Actualize the Investment Control in the Construction of a New Colliery
浅谈在煤矿新井建设中如何实施“投资控制”
5.
The Coal Mine Security Input Research Based on Behavioral Economics
基于行为经济学研究我国煤矿安全投入问题
6.
A strategic study of the three Chinese coal-mine calamity peaks;
新中国煤矿矿难高发期分析及对策研究
7.
Setting up the Innovation Index System of State-Owned Mine and It's Application Research;
国有煤矿创新指标体系的建立及其应用研究
8.
The Study of State-Owned Coal Mine Innovation System and Its Index System;
国有煤矿创新系统及其指标体系的研究
9.
Discussion on the Technological Innovation and Reliability Improvement of Coal Mining Machinery in Our Country;
浅谈我国煤矿机械的技术创新与可靠性提高
10.
China National Coal Corporation
中国统配煤矿总公司
11.
Application of the Government of the PRC for Registration of the China Ocean Mineral Resources Research and Development Association as a Pioneer Investor
中华人民共和国政府要求将中国大洋矿产资源研究开发协会登记为先驱投资者的申请书
12.
How does New "Mineral Law" of Mongolia Exercise Influence on the Investors of China;
蒙古新《矿产法》对我国投资者的影响分析
13.
Sustainable development of China s mining industry and environmental pollution problem in coal mining;
中国矿业可持续发展与煤矿开采环境问题—21世纪初矿山岩石力学面临的新机遇和挑战
14.
ESTIMATING MODEL OF ENGINEERING COST IN COALMINE CONSTRUCTION TENDER
煤矿建设投标中工程造价的估算模型
15.
Analysis of Safety Input-output in Coal Mine Based on DEA Model
基于DEA模型的煤矿安全投入产出分析
16.
Coal Mine Construction Project Investment Post-evaluation Research and Practice
煤矿投资建设项目后评价研究与实践
17.
Practice of Constructing New-style Modern Mines in Suncun Colliery;
孙村煤矿构建新型现代化矿井的实践
18.
Application of Coal Plow Made in Xinqiang Coal Mine in Thin Coal Seam
新强煤矿自制刨煤机在薄煤层中的应用管理