说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 句库 -> 乌江彭水水电站
1.
Using Microsatellite Markers to Assess the Impacts by Pengshui Hydropower Station on Wujiang River on Population Genetic Diversity in Pseudogyrincheilus procheilus
利用微卫星标记评估乌江彭水水电站对泉水鱼的遗传多样性影响
2.
Concrete construction technique for lining of diversion tunnel(No.1 tender section) of Pengshui Hydropower Station on Wujiang River
乌江彭水水电站导流洞第一标段洞身混凝土施工技术
3.
Design Features of the Generator of Wujiang Shatuo Hydropower Station in Guizhou
贵州乌江沙沱水电站发电机设计特点
4.
The Water Turbine Stability Problem Study for Wujiang Goupitan Hydropower Station;
乌江构皮滩水电站水轮机稳定性问题研究
5.
Research on Long-Mid Term Optimal Dispatching of Hydroelectric Plant in Wujiang River;
乌江梯级水电站中长期发电优化调度研究
6.
Effect of Wujiang River cascade hydropower stations on West to East Power Transmission Project;
乌江梯级水电站在贵州西电东送中的作用
7.
Research and Application of Economic Operation of Wujiang Cascaded Hydroelectric Stations;
乌江梯级水电站的经济运行研究及应用
8.
Earthquakes Safety Evaluation and Research on Yinpan Hydroelectric Power Station in WuJiang River
乌江银盘水电站地震安全性评价与研究
9.
Study on High Slope Stability at the Dam Site of the Wudongde Hydropower Station in Jinsha River
金沙江乌东德水电站坝址高边坡稳定性研究
10.
Design and Construction of Impermeable and Anti-breath Cofferdam in Siling Hydropower Station,Wujiang,Guizhou
贵州乌江思林水电站围堰防渗闭气设计及施工
11.
Seepage State Analysis and Evaluation for Wujiangdu Hydropower Station
乌江渡水电站绕坝渗漏性态分析与评价
12.
Talking about Economizing on Energy and Water of Wujiang Cascade Hydropower Stations from Operational Mode
从运行方式谈乌江梯级水电站节能降耗工作
13.
Hongjia Ferry hydropower station is a tap station of wujiang River step exploitation in Guizhou province.
洪家渡水电站是贵州省乌江梯级开发的一个龙头电站。
14.
Study on Short-Term Generate Electricity Optimal Dispatching System of Wujiang River Cascaded Hydropower Stations and Reservoirs;
乌江梯级水电站水库群短期发电优化调度系统研究
15.
Research on In-situ Shear Test of RCC for Pengshui Hydropower Station
彭水水电站碾压混凝土原位抗剪试验研究
16.
Consolidation grouting test of tail water slope for underground factory building of Wu river Goupitan Hydropower station
乌江构皮滩水电站地下厂房尾水边坡固结灌浆试验
17.
Installation method and structure characteristics of turbine-generator units for Pengshui hydropower station
彭水水电站水轮发电机组结构特点和安装方法介绍
18.
Rebuild and Implementation of the Safety Monitoring Automated System of Wu Jiang Dongfeng Hydropower Station Hub;
乌江东风水电站枢纽安全监测自动化系统改造与实施