1.
Construction Technology of the Invert Lining and Scratch Mold for Jinping Diversion Tunnel
锦屏引水隧洞底拱衬砌刮模施工技术
2.
Application of portal lining jumbo in construction of bottom arch of diversion tunnel of Liuping Hydropower Station
自行式底拱衬砌台车在柳坪水电站引水隧洞施工中的应用
3.
A Study on Stability of Lining Structure for Plunge Pool with Inverted-arch Type;
反拱形水垫塘衬砌结构的稳定性研究
4.
Analysis of Secondary Lining Support Time and Load Distribution in Bi-arch Tunnel
联拱隧道二次衬砌的时机和荷载分析
5.
"Wet sprayed concrete for supporting purposes during the drive, in situ concrete for the up to 3 m thick Base and for lining the vault."
掘进过程中的支护采用湿喷混凝土,3米厚的基底和穹拱衬砌采用浇注混凝土。
6.
Analogue Simulation for Crown Cantilever of Masonry Arch Dam
砌石拱坝上游拱冠梁底部拉应力仿真分析
7.
Bearing Capacity Analysis and Design Optimization of the Multi-arch Tunnel Lining;
连拱隧道复合衬砌承载能力分析及优化设计
8.
Application technology of simple arch-frame turn-over form in inclined shaft lining construction
简易拱架翻板模在斜井衬砌施工中的应用技术
9.
Construction Technologies for Secondary Lining of the Low Wall and Primary Filling of the Side Arch of Tunnel
隧道二次衬砌矮边墙与边拱一次灌注施工技术
10.
The Research on the Key Technology of the Crack Controlling of Reinforced Concrete Lining of Undersea Tunnel;
海底隧道衬砌裂缝控制关键技术研究
11.
Theoretical and Experimental Studies on Predicting the Service Life of Subsea Tunnel Lining Structures;
海底隧道衬砌结构寿命预测理论与试验研究
12.
Operation Status of Prestressed Concrete Liner in the Xiaolangdi Desilting Tunnels;
小浪底排沙洞预应力混凝土衬砌运行状况研究
13.
STUDY ON DURABLITY OF LINING CONCRETE IN JIAOZHOU BAY SUBSEA TUNNEL
胶州湾海底隧道衬砌混凝土耐久性研究
14.
Service Life Prediction of Lining Concrete for Jiaozhou Bay Subsea Tunnel
胶州湾海底隧道衬砌混凝土服役寿命预测
15.
Application of Vacuum Absorbing Water in Canal Bottom Lining of South-to-North Water Transfer Project
真空吸水在南水北调渠底衬砌工艺中的应用
16.
Mechanical Properties of Lining Structure and Its Cross Section Shape Optimization of Subsea Tunnel
海底隧道衬砌结构受力特点及断面形状优化
17.
Analytical solution of internal force and displacement in multi-center circular arc tunnel lining based on initial parameter method
基于初参数法的多心圆拱隧道衬砌结构内力与变位求解
18.
The vehicle stands on the finished concreted tunnel Base with the direction of travel corresponding to the direction of lining.
车辆位于浇注好的隧道基底上,移动方向与衬砌方向一致。