1.
Assembly and debugging technique of TB880E shield in the narrow space
TB880E掘进机狭小场地组装调试技术
2.
Technology of Quickly Assemble and Debugging in Small Venues of TBM Outside Tunnel
TBM洞外狭小场地快速组装调试技术
3.
The Plug Doors for Vehicles for the Express Rail Traffic No.3 Line in Dalian and the Optimization of the Assembly and Trial Operation Technology
大连市快速轨道交通3号线车辆塞拉门及其组装调试工艺的优化
4.
Construction,Installation and Commissioning Experiences for 900 MW Units;
900MW机组的施工、安装和调试经验
5.
Check and adjust radial angular and axial misalignment both ends of coupling.
④检查并调整机组的径向、向及周向不对中至机组安装调试标准值。
6.
Check and adjust radial angular and axial misalignment both ends of coupling .
检查并调整机组的径向、角向及周向不对中至机组安装调试标准值。
7.
Good experience in assembly and adjustment of electromechanical equipments.
有一定的机电一体化设备组装及调试经验。
8.
On the Teaching Reform in PLC Control System Debugging and Fitting
谈《PLC控制系统组装与调试》课程教学改革
9.
The Installation and Test of the Hydraulic Turbine Guide Bearing of Three Gorges Right Bank Power Station
三峡右岸机组水导轴承安装及调试特点
10.
The control principles of900 MW steam turbine governing valves are introduced, and the data relating to the servo valve installation and debugging are analyzed.
介绍了900MW机组汽机调门控制原理,分析了伺服安装调试数据。
11.
Project implementation, including delivery, site, testing and commissioning arrangement and so on.
项目执行,包括发运、场、装调试和验收等工作的组织和安排。
12.
Research on the Key Technics during Installation and Commission Process of Large Combined Cycle Units;
大型联合循环发电机组安装调试关键技术与应用研究
13.
TYPICAL CONTROL PROBLEMS ENCOUNTERED IN COMMISSIONING TEST OF FOSSILFIRED POWER GENERATING UNITS AND THEIR SOLUTIONS
火电机组控制设备安装调试的典型问题及其解决措施
14.
Installs the Debugger Interface for stored procedure debugging.
安装调试程序接口以调试存储的过程。
15.
Commissioning on CSC-246A Autorestart Equipment
CSC-246A型备自投装置调试
16.
On the Integrated Test Technology of Object-Oriented Test;
试论面向对象测试中的组装测试技术
17.
The Optimization on Insertion Scheduling for a Printed Circuit Board Assembly Machine
PCB插装机组装调度优化及其实证研究
18.
Function test of radio console on sea trial.
航行试验中组装报务台效用试验。